1
1-104
Reference diagram for air-discharge chamber (f eld supply)
The models of
AES71PIH3E
with STK-DRV80U,
AES100PIH3E / AES125PIH3E with STK-UFV80E and STK-UFV160E
CAUTION
NOTE
CAUTION
CAUTION
Required space around outdoor unit
If the air discharge chamber is used, the space shown below must be secured around the outdoor unit.
If the unit is used without the required space, a protective device may activate, preventing the unit from operating.
(1) Single-unit installation
The top and both sides must remain open.
If there are obstacles to the front and rear of the outdoor unit,
the obstacle at either the front or rear must be no taller than the height of the outdoor
unit.
(2) Multiple-unit installation
Installation in lateral rows
The front and top must remain open.
The obstacles must be no taller than the height of the outdoor unit.
Installation in front-rear rows
Installation with intakes facing
intakes or outlets facing outlets
The front and both sides must remain open.
The amount of space required for
removing the screws on the rear of
the unit.
If in case the suff cient space for
maintenance is ensured on the
rear of the outdoor unit, installation
is possible with the space of both
sides of not less than 150mm where
marked with * mark.
AES71PIH3E requires space
Min. 200mm or more.
Unit: mm
Min. 250*
1
or
more
Not less than 150* or more
Unit: mm
Unit: mm
Min. 250*
1
or
more
Min.
200 or
more
Min. 1000 or more*
1
Min. 300 or more*
2
Min.
500*
1
or more
Min.
150*
2
or more
*
1
AES71PIH3E requires space
Min. 1000mm or more.
*
2
AES71PIH3E requires space
Min. 200mm or more.
*
1
AES71PIH3E requires space
Min. 1500mm or more.
*
2
AES71PIH3E requires space
Min. 400mm or more.
*
1
AES71PIH3E requires space
Min. 300mm or more.
SM830159-06̲Elite̲PAC-i.indb 391
SM830159-06̲Elite̲PAC-i.indb 391
2012/04/27 15:23:15
2012/04/27 15:23:15