Operation Guide
P341/EN O/B11
Installation
CHAPTER 2
MiCOM P341
Page 3/10
1.
RECEIPT OF RELAYS
Protective relays, although generally of robust construction, require careful treatment
prior to installation on site. Upon receipt, relays should be examined immediately to
ensure no external damage has been sustained in transit. If damage has been
sustained, a claim should be made to the transport contractor and ALSTOM T&D
Protection & Control should be promptly notified.
Relays that are supplied unmounted and not intended for immediate installation
should be returned to their protective polythene bags and delivery carton. Section 3
of this chapter gives more information about the storage of relays.
2.
HANDLING OF ELECTRONIC EQUIPMENT
A person’s normal movements can easily generate electrostatic potentials of several
thousand volts. Discharge of these voltages into semiconductor devices when
handling electronic circuits can cause serious damage which, although not always
immediately apparent, will reduce the reliability of the circuit. This is particularly
important to consider where the circuits use complementary metal oxide
semiconductors (CMOS), as is the case with these relays.
The relay’s electronic circuits are protected from electrostatic discharge when housed
in the case. Do not expose them to risk by removing the front panel or printed circuit
boards unnecessarily.
Each printed circuit board incorporates the highest practicable protection for it’s
semiconductor devices. However, if it becomes necessary to remove a printed circuit
board, the following precautions should be taken to preserve the high reliability and
long life for which the relay has been designed and manufactured.
1.
Before removing a printed circuit board, ensure that you are at the same
electrostatic potential as the equipment by touching the case.
2.
Handle analogue input modules by the front panel, frame or edges of the
circuit boards. Printed circuit boards should only be handled by their edges.
Avoid touching the electronic components, printed circuit tracks or connectors.
3.
Do not pass the module to another person without first ensuring you are both at
the same electrostatic potential. Shaking hands achieves equipotential.
4.
Place the module on an anti-static surface, or on a conducting surface which is
at the same potential as yourself.
5.
If it is necessary to store or transport printed circuit boards removed from the
case, place them individually in electrically conducting anti-static bags.
In the unlikely event that you are making measurements on the internal electronic
circuitry of a relay in service, it is preferable that you are earthed to the case with a
conductive wrist strap. Wrist straps should have a resistance to ground between
500ký to 10Mý. If a wrist strap is not available you should maintain regular contact
with the case to prevent a build-up of electrostatic potential. Instrumentation which
may be used for making measurements should also be earthed to the case whenever
possible.
More information on safe working procedures for all electronic equipment can be
found in BS EN 100015: Part 1:1992. It is strongly recommended that detailed
investigations on electronic circuitry or modification work should be carried out in a
special handling area such as described in the aforementioned British Standard
document.
Summary of Contents for MiCOM P341
Page 1: ...MiCOM P341 Interconnection Protection Relay Operation Guide P341 EN O B11...
Page 2: ......
Page 3: ...Operation Guide MiCOM P341 Interconnection Protection Relay Volume 2...
Page 4: ......
Page 6: ...P341 EN O A11 Operation Guide Issue Control MiCOM P341...
Page 8: ...P341 EN O B11 Operation Guide MiCOM P341...
Page 10: ......
Page 12: ......
Page 17: ...Operation Guide P341 EN O B11 MiCOM P341 CHAPTER 1 Introduction...
Page 18: ...P341 EN O B11 Operation Guide MiCOM P341...
Page 41: ...Operation Guide P341 EN O B11 MiCOM P341 CHAPTER 2 Installation...
Page 42: ...P341 EN O B11 Operation Guide MiCOM P341...
Page 44: ...P341 EN O B11 Operation Guide CHAPTER 2 Installation Page 2 10 MiCOM P341...
Page 53: ...Operation Guide P341 EN O B11 MiCOM P341 CHAPTER 3 Commissioning and Maintenance...
Page 54: ...P341 EN O B11 Operation Guide MiCOM P341...
Page 58: ...P341 EN O B11 Operation Guide CHAPTER 3 Commissioning and Page 4 80 Maintenance MiCOM P341...
Page 135: ...Operation Guide P341 EN O B11 MiCOM P341 CHAPTER 4 Problem Analysis...
Page 136: ...P341 EN O B11 Operation Guide MiCOM P341...
Page 138: ...P341 EN O B11 Operation Guide CHAPTER 4 Problem Analysis Page 2 8 MiCOM P341...
Page 145: ...Operation Guide P341 EN O B11 MiCOM P341 APPENDIX A Relay Menu Database...
Page 273: ...Operation Guide P341 EN O B11 MiCOM P341 APPENDIX B External Connection Diagrams...
Page 274: ...P341 EN O B11 Operation Guide MiCOM P341...
Page 278: ...P341 EN O A11 Operation Guide MiCOM P341...
Page 281: ......