Pag.
48
OPERATING INSTRUCTIONS
ORIX 70
DOUBLE JOINTED SPRING ARM
SETTING
Ref. A
1)
Bring side
“A”
of th double jointed arm in
STOP
position upowards, forming an angle of
90°
with side
“B”.
2)
Remove the locking cap.
3)
Insert inside the arm the tube key
M13
provided and push it softly till the end.
4)
Hook the nut
M.8
5)
TURN:
to the RIGHT
to increase load.
to the LEFT
to decrase load.
6)
Slip out the tube key
M13
and check the counterbalancing of the arm.
7)
If everyting is regular, replace the locking cap
Ref. B