35
YT169A
7. Make sure the crankshaft is positioned at TDC; then
install the camshaft with the single large reference
hole (A) directed up and the two small timing holes
(B) parallel to the top of the cylinder head.
YT095A
YT173A
8. Place the camshaft holder into position on the cylin-
der head making sure the camshaft bearings are
seated correctly; then install four flat washers (A)
and four nuts (B). Tighten in a crisscross pattern to
15 ft-lb.
YT172A
9. Install the two cap screws securing the left side of the
cylinder head and cylinder to the crankcase and
tighten to 7 ft-lb.
YT098B
10. Install the cam chain tensioner assembly into the cyl-
inder using a new gasket; then secure with two cap
screws and tighten to 7 ft-lb.
YT098C
11. Using a small flat screwdriver, release the cam chain
tension spring by rotating clockwise; then install the
plug bolt and tighten securely.
12. Adjust the valve/tappet clearance (see the Periodic
Maintenance/Tune-Up section); then install the valve
cover with new gasket. Tighten the cap screws to 7
ft-lb.