background image

3

NEW BUILD

RETRO-FIT

RETRO-FIT

OUTER FRAME PREPARATION - STONE/TILE

NEW BUILD

To create recess for Outer Frame:

Carefully cut existing tile/stone to 
create recess for Outer Frame  (A).
Remove debris to a depth suitable for 
overall height of V-LOCK model to be 
installed (See Page 2) plus mortar bed 
allowance (B). 

RETRO-FIT

1

1

2

Align & centre Outer Frame over 
existing skimmer box opening (A).
Mark perimeter of Outer Frame on 
surrounding stone/tile (B).

•       

Check & confirm finished height of 
stone/tile.
Check & confirm overall height of 
V-LOCK model to be installed
(See Page 2). 
Prepare a level bed slightly larger than 
overall size of Outer Frame including  
mortar bed allowance (A).

Summary of Contents for 475-201

Page 1: ...DO NOT USE ACID CHEMICAL WASHES DISCOLORATION MAY OCCUR AND WILL VOID WARRANTY INSTALLER TO ENSURE INSTALLATION MEETS ALL APPLICABLE ENGINEERING REGULATORY REQUIREMENTS DO NOT CARRY LID WITH KEY ALWA...

Page 2: ...F LID SEE PAGE 9 2 DO NOT CARRY LID WITH LID KEY AS THIS MAY RESULT IN INJURY OR DAMAGE 3 DO NOT USE HARSH CHEMICALS ACIDS OR ABRASIVE MATERIALS TO CLEAN LID OUTER FRAME OR LID KEY 4 KEEP LID KEY OUT...

Page 3: ...pand our product range Please contact us at hello aquea com au if you have any feedback or suggestions key dimensions MODEL V10 V15 V20 V30 Overall Depth Overall Width Overall Length Internal Lid Dept...

Page 4: ...ght of V LOCK model to be installed See Page 2 plus mortar bed allowance B RETRO FIT 1 1 2 Align centre Outer Frame over existing skimmer box opening A Mark perimeter of Outer Frame on surrounding sto...

Page 5: ...t compound OPTIONAL Remove Install Plate P N 475 209 after compound is fully cured B To lay mortar bed Using appropriate mortar mix insert mortar into recess surrounding skimmer box opening A IMMEDIAT...

Page 6: ...djust as required to ensure Outer Frame is square level and centred on skimmer box opening A Attach Outer Frame to sub frame with suitable fasteners through pre moulded mounting holes B 1 2 3 To prepa...

Page 7: ...t to correct size to suit V LOCK Lid A See Page 2 To mark V notch cut out Place inlay material with preferred surface facing upwards Position Spacer Plate on inlay material Align centre V notch edge o...

Page 8: ...rt tiling wedges or similar to adjust inlay to correct position A LEAVE FOR APPROXIMATELY 24 HOURS TO ALLOW ADHESIVE TO CURE FULLY To install inlay material into Lid Place inlay material face down on...

Page 9: ...MINIMUM 2 0mm LESS THAN LID INTERNAL DEPTH To prepare Lid for mounting battens Invert Lid and select preferred mounting points for correct batten orientation Drill holes in pre moulded locations to su...

Page 10: ...ock as shown A Rotate Key 90 degrees clockwise to unlock position Lid Key is now captive in Lid To remove Lid Using Lid Key as a handle lift Lid upwards A then grab edges of Lid by hands and remove fr...

Page 11: ...where a the Product has not been installed in accordance with the installation instructions provided with the Product any statutory requirements and these terms and conditions b the Product has not be...

Page 12: ...a division of Vantage Products Pty Ltd U 1 1 2 2 24 R E D L A N D D R I V E M I TC H A M V I C TO R I A 3 1 3 2 S A L E S S U P P O R T E N Q U I R I E S H E L LO AQ U E A CO M AU P H O N E 0 4 8 1 8...

Reviews: