Applying decking:

Lay decking around Outer Frame 
leaving a small clearance gap (A).

HINT:

 For a seamless installation, cut 

boards spanning Outer Frame so that a 
section equal to width of Lid is 
removed. These pieces can be used to 
create a perfectly grain-matched Lid 
inlay.

To install Outer Frame:

Adjust as required to ensure Outer 
Frame is square, level and centred on 
skimmer box opening (A).
Attach Outer Frame to sub-frame with 
suitable fasteners through 
pre-moulded mounting holes (B).

1

2

3

To prepare sub-frame:

Construct square opening in 
sub-frame slightly larger than Outer 
Frame, centred over skimmer box 
opening (A).
Fix corner gussets to sub-frame 
opening. Ensure gussets are recessed 
so top surface of Outer Frame rim is 
flush with finished decking level (B).

•       

OUTER FRAME INSTALLATION

 

-

 

Decking

Summary of Contents for 475-201

Page 1: ...DO NOT USE ACID CHEMICAL WASHES DISCOLORATION MAY OCCUR AND WILL VOID WARRANTY INSTALLER TO ENSURE INSTALLATION MEETS ALL APPLICABLE ENGINEERING REGULATORY REQUIREMENTS DO NOT CARRY LID WITH KEY ALWA...

Page 2: ...F LID SEE PAGE 9 2 DO NOT CARRY LID WITH LID KEY AS THIS MAY RESULT IN INJURY OR DAMAGE 3 DO NOT USE HARSH CHEMICALS ACIDS OR ABRASIVE MATERIALS TO CLEAN LID OUTER FRAME OR LID KEY 4 KEEP LID KEY OUT...

Page 3: ...pand our product range Please contact us at hello aquea com au if you have any feedback or suggestions key dimensions MODEL V10 V15 V20 V30 Overall Depth Overall Width Overall Length Internal Lid Dept...

Page 4: ...ght of V LOCK model to be installed See Page 2 plus mortar bed allowance B RETRO FIT 1 1 2 Align centre Outer Frame over existing skimmer box opening A Mark perimeter of Outer Frame on surrounding sto...

Page 5: ...t compound OPTIONAL Remove Install Plate P N 475 209 after compound is fully cured B To lay mortar bed Using appropriate mortar mix insert mortar into recess surrounding skimmer box opening A IMMEDIAT...

Page 6: ...djust as required to ensure Outer Frame is square level and centred on skimmer box opening A Attach Outer Frame to sub frame with suitable fasteners through pre moulded mounting holes B 1 2 3 To prepa...

Page 7: ...t to correct size to suit V LOCK Lid A See Page 2 To mark V notch cut out Place inlay material with preferred surface facing upwards Position Spacer Plate on inlay material Align centre V notch edge o...

Page 8: ...rt tiling wedges or similar to adjust inlay to correct position A LEAVE FOR APPROXIMATELY 24 HOURS TO ALLOW ADHESIVE TO CURE FULLY To install inlay material into Lid Place inlay material face down on...

Page 9: ...MINIMUM 2 0mm LESS THAN LID INTERNAL DEPTH To prepare Lid for mounting battens Invert Lid and select preferred mounting points for correct batten orientation Drill holes in pre moulded locations to su...

Page 10: ...ock as shown A Rotate Key 90 degrees clockwise to unlock position Lid Key is now captive in Lid To remove Lid Using Lid Key as a handle lift Lid upwards A then grab edges of Lid by hands and remove fr...

Page 11: ...where a the Product has not been installed in accordance with the installation instructions provided with the Product any statutory requirements and these terms and conditions b the Product has not be...

Page 12: ...a division of Vantage Products Pty Ltd U 1 1 2 2 24 R E D L A N D D R I V E M I TC H A M V I C TO R I A 3 1 3 2 S A L E S S U P P O R T E N Q U I R I E S H E L LO AQ U E A CO M AU P H O N E 0 4 8 1 8...

Reviews: