- 54 -
BREAK-IN PERIOD
Operation During Break-In Period
Your watercraft is equipped with a 4 stroke closed loop water cooled engine. Having a
break-in period is crucial to its proper performance and the product life. The engine
break-in period allows various components of the engine to wear and polish
themselves to the correct operation clearances and conditions. The scheduled oil
change during the break-in period is also required. It will prevent excessive wear and
damage to the components. Failure to perform the required break-in period may
significantly handicap your craft performance, shorten the product life. In certain
circumstances, it may void your craft warranty.
A break-in period of 6 operating hours is recommended before running the watercraft
at sustained full throttle. During this period, maximum throttle should not exceed 1/2 to
3/4 opening. However, brief full acceleration and speed variations contribute to a good
break-in.
NOTICES
:
Continued wide open throttle accelerations or operation, prolonged cruising
speeds are detrimental during the break-in period.
YOU MUST CHANGE ENGINE OIL, REPLACE OIL FILTER AFTER FIRST 10
HOURS OPERATION BY AN AUTHORIZED AQUANAMI DEALER!
It is highly recommended that after the first 10 hours of operation, the watercraft be
checked by an authorized Aquanami dealer. This inspection will also provide the
opportunity to discuss the unanswered questions you may have encountered during
the first hours of operation.
Summary of Contents for JETANGLER
Page 2: ...AQUANAMI LLC 809 Grandview Drive Hampstead NC 28443 USA...
Page 9: ...7 SAFETY INFORMATION...
Page 24: ...22...
Page 30: ...28 Label 2 Label 3 Label 4...
Page 31: ...29 Label 5 Label 6...
Page 32: ...30 Compliance Labels Label 7 Label 8...
Page 33: ...31 Label 9 Label 10...
Page 41: ...39 WATERCRAFT INFORMATION...
Page 67: ...65 MAINTENANCE INFORMATION...
Page 95: ...93 TECHNICAL INFORMATION...
Page 102: ...100 TROUBLESHOOTING...
Page 106: ...104 WARRANTY...
Page 113: ...111 CUSTOMER INFORMATION...