COMMISSIONING THE SHOWER HEATER
2. Turn on the water
and electricity,
before fitting the front cover.
Push the on/off button,
to check water flow and
if there is any leakage
inside the heater or
at any shower connection.
1. Before installation,
rotate the volume control
handle clockwise until
resistance is felt.
Connect the water
and electricity supply.
IMPORTANT NOTE FOR THE INSTALLER
1
2
IMPORTANT
Tum the Temperature control knob anticlockwise until the valve is fully open before switching on the unit.
This will ensure a fast fill up of the unit when the shower is first switched on.
IMPORTANT
The shower unit must be full of water before heat settings are used.