Top fixing position
200 mm.
367 mm.
arrow depict water and
electrical entry points.
PLUMBING CONNECTIONS
POSITIONS:
• SIDE LEFT
• SIDE RIGHT
• BOTTOM LEFT
• BOTTOM RIGHT
• REAR LEFT
• REAR RIGHT
NOTE!
PLUMBING THE
SHOWER UNIT MUST
PROCEED WIRING!
The shower unit can be
both plumbed and
wired from 6 different
A
B