AQUA SALT EVO
MAINTENANCE AND INSTRUCTION MANUAL
Salt chlorine generator
ENGLISH
ADSP7000753
rev. 2.0
23/04/2019
74/96
74
1.
Switch off circulation pump
and close input and output
valves in eletrolitic cell system
o.
2.
Knock off flow sensor
and pressure switch cable
and
temperature
probe
from AQUASALT EVO
control
box
3.
Unscrew off the three
electrodes of cable with
cap from cell.
4
. Unscrew two blu rings
from cell
5.
Get off locking ring and o-ring
from tre cell.
6.
Unscrew
the
three
electrodes with a tubular
key 8 mm.
Don
’t loose the
three o-ring you find
inside.
7.
Remove titanium plates.
Don
’t
loose
electrodes
locking baffler
8.
In a bowl put 9 parts of
water and add 1 part of
hydrochloric acid so that fully
dip
titanium
plates
in
solution. Avoid to get in
contact brass electrodes with
acid solution prepared.
9.
After cleaning insert plates in
the cell slots.Go on from right to
left according to this sequence:
1 with electrod
– 5 simple – 1
with electrod
– 5 simple – 1 with
electrod.
10.
To
reassemble
electrolitic cell and set it in
the system proceed from
point 6 to point 1 Screw
electrodes (point 6) until
the stop without force and
check to put again the
three o-ring in their sites