AQUA SALT EVO
MAINTENANCE AND INSTRUCTION MANUAL
Salt chlorine generator
ENGLISH
ADSP7000753
rev. 2.0
23/04/2019
58/96
58
3.1.3
Electrolytic Cell and
control box
installation
At this point, it is necessary to connect the electrolytic cell to the control box by connecting flow
sensor/pressure, temperature probe and the part that provides voltage to the plates, as indicated in
the image sequence below:
1.
1
→
cell supply voltage
2
→
temperature sensor
2.
Connect the temperature
probe.
3.
Insert the white rubber cap
to cover the connection
wires..
3.1.4
Grounding Kit
The kit prevents electric noise from plastic pipes and tubes, which may cause wrong indications
on measurement instruments, especially pHmeters and Rxmeters. Please install the grounding
electrodes upstream (1) and downstream (2) the cell and connect them to a ground lead.
✓
Connect to ground circuit separate and independent from the main circuit.