
8
Quality for Professionals
To mount the implement on the three-point linkage of the tractor, bolt the tractor
linkage drawbar between your seeder and the supplies counter plate. You should use
at least 8 bolts with a diameter of 10 mm. Then install the supplies top link bracket
onto the frame of the spreader. Now you can attach the spreader onto the three-point
linkage of your towing vehicle.
CAUTION:
APV is not liable for improper mounting or faulty use of the implement.
Installation of the baffle plates on the MDP and MDG
The baffle plates can be mounted using the standard supplied hexagon shaft or
directly (without the hexagon shaft) onto the soil tillage implement.
The following points must be noted when
mounting onto the implement (cultivator,
harrow, etc.):
•
To install the baffle plates, you must
bend the "tabs" on the sides towards
the rear (approx. 80°, see Fig.: 4)
using pliers and then bolt or weld them
with the hexagon shaft onto the
implement.
•
To prevent the baffle plates from sliding to the sides on the hexagon shaft,
fasten the baffle plates with a chisel and hammer (see Fig.: 5, Fig.: 6).
•
The baffle plates should be evenly distributed over the entire width of the
implement, with a max. spacing of 75 cm.
NOTE:
for proper distribution, the max. spacing between the baffle plates may not
exceed 75 cm. For the MDP (6 outlets), this results in a maximum working width of
4.5 m.
Fig.: 6
Fig.: 5
~80°
Fig.: 4