background image

14

 -

English

Characteristics of the operator

1

1.0       General characteristics .............................................................................................................................................................................

15

1.1       Technical data ...........................................................................................................................................................................................

15

1.2       Choosing the type of automation ..............................................................................................................................................................

15

Checks and operations prior to the operator installation

3

3.0       Checking the gate .....................................................................................................................................................................................

17

3.1       Checking the operator components ..........................................................................................................................................................

17

3.2       Mounting tools...........................................................................................................................................................................................

18

4

4.0       Positioning the mountings .........................................................................................................................................................................

18

4.1       Prepping the rear operator mounting ........................................................................................................................................................

19

4.1.1    Operator fi xed on iron posts......................................................................................................................................................................

19

4.1.2    Operator fi xed on 

wooden posts ...............................................................................................................................................................

19

4.1.3    Operator 

fi

 xed on masonry posts ..............................................................................................................................................................

19

4.1.4    Rear operator mounting - special cases ...................................................................................................................................................

20

4.2       Fixing the rear operator mounting .............................................................................................................................................................

21

4.3       Temporary installation of the operator.......................................................................................................................................................

21

4.4       Positioning the front operator mounting ....................................................................................................................................................

22

4.5       Final installation of the operator  ...............................................................................................................................................................

23

4.5.1    Mechanical 

fi

 xing ......................................................................................................................................................................................

23

4.5.2    Checking the motion .................................................................................................................................................................................

23

4.5.3    Electrical connection .................................................................................................................................................................................

23

4.5.4    Fitting the protection casing and removing the bleed screw  ....................................................................................................................

23

4.5.5    Bleeding ....................................................................................................................................................................................................

24

Checks and adjustments

5

5.0       Checking and adjusting the thrust force....................................................................................................................................................

24

7

7.0       Maintenance .............................................................................................................................................................................................

25

7.1       Troubleshooting.........................................................................................................................................................................................

25

Installing the operator

Notes for the installer

Contents / Characteristics

Description of the automation system

2

2.0       Components layout ...................................................................................................................................................................................

16

2.1       System electrical connection  ...................................................................................................................................................................

16

Emergency manoeuvre 

6

6.0       Emergency manoeuvre - use of the manual release  ..............................................................................................................................

24

Summary of Contents for ZT4 C

Page 1: ...ses 20 4 2 Fixing the rear operator mounting 21 4 3 Temporary installation of the operator 21 4 4 Positioning the front operator mounting 22 4 5 Final installation of the operator 23 4 5 1 Mechanical...

Page 2: ...n the basis of the characteristics and dimensions of the element to be operated Caution The choice of the most suitable type of automation assures an efficient operation of the unit and minimises the...

Page 3: ...the operator power cable with a sheath if necessary do this before connecting the cable to the junction boxes Warning Every operator comes complete with a pickup capacitor During installation connect...

Page 4: ...rule the ideal point is always in the strongest area where the fixing of the gate leaf has the least effect If there is not a broad strip of steel in the gate framework then a suitable support needs...

Page 5: ...SAG 285 14 7 USAG 285 17 4 INSTALLING THE OPERATOR 4 0 POSITIONING THE MOUNTINGS The following table C1 indicates the recommended data for defining the position of the operator mountings in relation t...

Page 6: ...ixing screws C4 The size of the reinforcing plate must be in proportion to the size of the column Warning If the size of the column allows for it use the Aprimatic standard plate provided 4 1 3 Operat...

Page 7: ...nsert the mesh sheaths C8 pos 3 into the holes and inject the quick dry glue C8 pos 4 see attached instructions for application method and quantity If the B type plate is used Insert the stud bolts C8...

Page 8: ...ly protected from weld residues When the welded zone has cooled down apply a coat of anti rust paint 4 3 TEMPORARY INSTALLATION OF THE OPERATOR Temporarily mount the operator to find the correct fixin...

Page 9: ...the strengthening plate is especially important with gate leaves made from thin sheet steel When cleaning the mounting zone for the operator front mounting remove the operator and protect it from fly...

Page 10: ...the movement this should be done very slowly otherwise the operators will take in air and consequently will have to be bled Open and close the gate leaf to check that the operator can move freely wit...

Page 11: ...crewdriver turn the control valves clockwise to increase the pressure and counter clockwise to reduce it Adjust both opening silver E8 pos 2 and closing pressure gold E8 pos 1 Caution The opening thru...

Page 12: ...sun for a long period with the gate closed check that the operator piston is not in the fully advanced position i e with the rod completely out Screw the pressure setting valve clockwise par 5 E8 pos...

Reviews: