1.6. Operation: Enabling High Voltage Starting Operations
Installation check-list:-
a)
A good earth has been connected to
the ‘Safety Earth’ on the front panel
.
Recommended configuration:
Earth connection from VAC Supply to CSP Safety Earth to Sea Earth or Vessel
Hull
b)
The sound source (boomer plate or sparker) has been connected and it is in the
water.
c)
A key mode is selected
–
either internal or external. Key connections are
connected.
d)
AC mains is connected to the ‘Mains Input’ connector.
e)
A safety check has been carried out to ensure that there is no-one in the water
and that crew members know that the unit is about to be operated.
Power Up
When suitably connected to ground, the transducer and AC mains, and the sound
source is deployed. The power can be applied using the ON / OFF switch and circuit
breaker. The front panel fans will run, and the HV OFF / RESET button will illuminate.
Press OK to accept safety warning and continue to Main Menu
Applied Acoustic Eng. Ltd.
CSP-SNv 1250
THIS UNIT CONTAINS LETHAL VOLTAGES AND MUST BE
EARTHED AT ALL TIMES.
ENSURE ADEQUATE SAFETY PROCEDURES ARE EMPLOYED