The Force™ 2-Stage Operation Manual
51
Revision Date 4/23/2019
7.7.
Appendix G. Electrical Screw Torque Requirements
1. Fuse Holders (1492-H6) = 7.1 lb-in
2. Power Supply (1606-XLE120E) – 7 lb-in
3. Terminal Blocks (1492-J4) = 9 lb-in
4. Ground Blocks (1492-JG4) = 9 lb-in
5. Ground Block Middle Screw (1492-JG4) = 7.1 lb-in
6. JG10 Large Ground Blocks (1492-JG10) = 20.4 lb-in
7. JG10 Large Ground Block Middle Screw (1492-JG10) = 8.9 lb-in
8. Small Motor Contactor Phillip Screws (100-C55D10) = 31 lb-in
9. Small Motor Contactor (43-44) Phillip Screws = 13 lb-in
10. Overload Relay (T1/T2/T3) Phillip Screws = 22 lb-in
11. Overload Relay (95-98) Phillip Screws = 5 lb-in
12. Large Motor Contactor Allen Screws (100-C72D10) = 53 lb-in
13. Large Motor Contactor Phillips Screws (100-C72D10) = 13 lb-in
14. Overload Relay Allen Screws (193-EEGE) = 40 lb-in
15. Overload Relay Phillips Screws (192-EEGE) = 5 lb-in
16. Micro 850 Power Supply = 4.4 lb-in
17. Micro 850 Terminal Strip = 4.4 lb-in
18. 2080 TC2 = 2.21 lb-in
19. 2080 IF4 = 2.21 lb-in
20. 2080 IF2 = 2.21 lb-in
21. HMI = 5 lb-in
22. Yellow Terminal Jumpers = 7.1 lb-in
23. Estop Contact (800F-X01) = 8 lb-in
24. Relay Base Screws (700-HN153) = 7 lb-in
25. IF8 = 5.3 lb-in
26. Relay Output Module = 5.3 lb-in
27. 10A Circuit Breaker (18 AWG) = 13.3 lb-in
28. 10A Circuit Breaker (14 AWG) = 17.7 lb-in
29. 10A Circuit Breaker (8 AWG) = 39.9 lb-in
30. Ewon Flexy Power Connector = 7 lb-in
31. Ewon Cosy Power Connector = 7 lb-in
32. 125V Plug = 12 lb-in
Summary of Contents for THE FORCE 2-STAGE
Page 21: ...The Force 2 Stage Operation Manual 21 Revision Date 4 23 2019 2 2 9 3 PLC Analog Inputs...
Page 22: ...The Force 2 Stage Operation Manual 22 Revision Date 4 23 2019 2 2 9 4 PLC Analog Outputs...
Page 46: ...The Force 2 Stage Operation Manual 46 Revision Date 4 23 2019...
Page 47: ...The Force 2 Stage Operation Manual 47 Revision Date 4 23 2019...
Page 48: ...The Force 2 Stage Operation Manual 48 Revision Date 4 23 2019 7 5 Appendix E CO2 Phase Diagram...
Page 53: ...The Force 2 Stage Operation Manual 53 Revision Date 4 23 2019...
Page 54: ...The Force 2 Stage Operation Manual 54 Revision Date 4 23 2019...
Page 55: ...The Force 2 Stage Operation Manual 55 Revision Date 4 23 2019...
Page 56: ...The Force 2 Stage Operation Manual 56 Revision Date 4 23 2019...
Page 57: ...The Force 2 Stage Operation Manual 57 Revision Date 4 23 2019 Z...
Page 58: ...The Force 2 Stage Operation Manual 58 Revision Date 4 23 2019...
Page 59: ...The Force 2 Stage Operation Manual 59 Revision Date 4 23 2019...
Page 60: ...The Force 2 Stage Operation Manual 60 Revision Date 4 23 2019...
Page 61: ...The Force 2 Stage Operation Manual 61 Revision Date 4 23 2019...
Page 62: ...The Force 2 Stage Operation Manual 62 Revision Date 4 23 2019...
Page 63: ...The Force 2 Stage Operation Manual 63 Revision Date 4 23 2019...
Page 64: ...The Force 2 Stage Operation Manual 64 Revision Date 4 23 2019...
Page 65: ...The Force 2 Stage Operation Manual 65 Revision Date 4 23 2019...
Page 66: ...The Force 2 Stage Operation Manual 66 Revision Date 4 23 2019...
Page 67: ...The Force 2 Stage Operation Manual 67 Revision Date 4 23 2019...