The Force™ 2-Stage Operation Manual
11
Revision Date 4/23/2019
face surface and threads clean. Failure to keep these surfaces clean can cause the
vessel not to seal properly.
2.1.2.2.
Locking Vessel Isolation Valves
– Each extractor has two locking isolation valves that
should be utilized whenever the operator is working in any vessel. These valves are
intended to valve off the inlet and outlet of the vessel to protect the user from any release
of pressure.
WARNING
: Failure to use these valves can lead to injury.
2.1.2.3.
Temperature Control Heat Exchangers
– The temperature control heat exchangers
regulate the temperature of the CO
2
just before it enters the extractor vessels and is in a
cooling loop along with the extractor vessel water jackets and the extractor flow switch.
2.1.2.4.
Extractor Flow
Switch
–The flow switch continually monitors for water flow in the
extractor loop and will stop the system if flow is lost.
2.1.2.5.
Vent Valves
– Each extraction vessel has its own vent valve (Valve 4A and 4B). These
valves will open automatically to vent the extractor so they are safe to open. These
valves should be vented to the vent valve manifold (located on the Separator Stand) or
outside.
2.1.2.6.
Pressure Gauges
– Three gauges: Extractor A, Extractor B and Pump outlet (located on
top of temperature control heat exchanger), are located on the extractor stands and
should correlate to the pressures on the HMI (Human Machine Interface) for each
portion.
2.1.2.7.
Junction Boxes
– Each extraction vessel has its own junction box which will have a
Harding Connector and at least one thermocouple connector that connects the main
control panel.
2.1.2.8.
Extraction Cap Hoists
– These hoists are intended to lift the breech lock cap out of the
extraction vessel for removal and loading of raw material. Be sure to remove hoses
before trying to remove cap.
CAUTION
: Hoist arms are limited to 50 lbs. Never try and lift
vessel with hoist.
2.1.2.9.
Extractor Closure Switch
– This limit switch indicates that the extraction vessel is
closed and ready for pressure. The extractor will not pressurize without this switch in
place.
Summary of Contents for THE FORCE 2-STAGE
Page 21: ...The Force 2 Stage Operation Manual 21 Revision Date 4 23 2019 2 2 9 3 PLC Analog Inputs...
Page 22: ...The Force 2 Stage Operation Manual 22 Revision Date 4 23 2019 2 2 9 4 PLC Analog Outputs...
Page 46: ...The Force 2 Stage Operation Manual 46 Revision Date 4 23 2019...
Page 47: ...The Force 2 Stage Operation Manual 47 Revision Date 4 23 2019...
Page 48: ...The Force 2 Stage Operation Manual 48 Revision Date 4 23 2019 7 5 Appendix E CO2 Phase Diagram...
Page 53: ...The Force 2 Stage Operation Manual 53 Revision Date 4 23 2019...
Page 54: ...The Force 2 Stage Operation Manual 54 Revision Date 4 23 2019...
Page 55: ...The Force 2 Stage Operation Manual 55 Revision Date 4 23 2019...
Page 56: ...The Force 2 Stage Operation Manual 56 Revision Date 4 23 2019...
Page 57: ...The Force 2 Stage Operation Manual 57 Revision Date 4 23 2019 Z...
Page 58: ...The Force 2 Stage Operation Manual 58 Revision Date 4 23 2019...
Page 59: ...The Force 2 Stage Operation Manual 59 Revision Date 4 23 2019...
Page 60: ...The Force 2 Stage Operation Manual 60 Revision Date 4 23 2019...
Page 61: ...The Force 2 Stage Operation Manual 61 Revision Date 4 23 2019...
Page 62: ...The Force 2 Stage Operation Manual 62 Revision Date 4 23 2019...
Page 63: ...The Force 2 Stage Operation Manual 63 Revision Date 4 23 2019...
Page 64: ...The Force 2 Stage Operation Manual 64 Revision Date 4 23 2019...
Page 65: ...The Force 2 Stage Operation Manual 65 Revision Date 4 23 2019...
Page 66: ...The Force 2 Stage Operation Manual 66 Revision Date 4 23 2019...
Page 67: ...The Force 2 Stage Operation Manual 67 Revision Date 4 23 2019...