3.4.1.7.
Using supplied squeeze bottle, flush cleaning agent through the second separator
(smaller separator in the bank) outlet down to the filter housing until the agent runs clear.
3.4.1.8.
Use compressed air to blow any residual cleaning agent out of CO
2
line and reassemble
filter.
3.4.1.9.
Reassemble separators and reattach tubing/hoses.
3.4.1.10. Open the Vessel Isolation Valves.
3.4.1.11. Close Valve 10A or B.
3.4.1.12. If in service separator mode, return to the main screen to continue the run.
3.4.2.
Cleaning out Extractor in Continuous Batch Mode
3.4.2.1.
When in continuous batch mode the system will automatically take vessels offline after
the extractor interval is complete. The system will pump the extractor down to 100psi and
then vent the remainder of the pressure from the vessel.
3.4.2.2.
When the pressure of the extractor has been vented, the extractor is safe to open by
using the rubber mallet to loosen the top nut, and then swing out of the way for storage.
3.4.2.3.
Close the two Vessel Isolation Valves on both the top and bottom lines to protect from
an unexpected release of pressure.
3.4.2.4.
Use a shop vac to remove the spent material from the vessel and then reload the
extractor in the same manner as described in Section 3.1.1. “Loading and Closing the
Extractor”.
3.4.2.5.
Once the extractor is loaded and closed properly, go to the “Elapsed Time Setting”
screen and verify that the extractor is ready to be brought back online.
3.4.2.5.1. If you do not verify the extractor is ready the system will continue running the current
extractor for another cycle.
3.4.2.5.2. If no verification is given in that cycle the system will recover and wait to be loaded
with fresh material.
3.4.2.6.
Be sure to open the Vessel Isolation Valves when the vessel is ready to run.
3.4.3.
Changing
Bottles
WARNING
Do not move bottles without caps and secure all bottles in use to the system
3.4.3.1.
From the manual screen select the “Change CO
2
Bottle” button.
3.4.3.2.
Close the bottle and crack the brass nut by rotating it counterclockwise an eighth turn to
vent the pressure in the lines.
3.4.3.3.
Remove the hose from the old bottle and reattach to the new bottle. Be sure to use the
CO
2
cylinder gasket.
3.4.3.4.
Secure the new bottle with the bottle straps.
3.4.3.5.
From the manual screen select the “Leave Bottle Change Mode” button.
3.5.
After the Cycle
3.5.1.
System Response on Shutdown
3.5.1.1.
Once the total run time is complete, the system will automatically recover the CO
2
in the
system back into the bottles. When all vessels get under 100psi the system will stop and
vent the extractors.
3.5.1.2.
The system will then prompt the operator to close the bottles and open Valve 10A and B.
Once acknowledged, the system will open all valves and release the remaining pressure
from the system.
Summary of Contents for THE FORCE 2-STAGE
Page 21: ...The Force 2 Stage Operation Manual 21 Revision Date 4 23 2019 2 2 9 3 PLC Analog Inputs...
Page 22: ...The Force 2 Stage Operation Manual 22 Revision Date 4 23 2019 2 2 9 4 PLC Analog Outputs...
Page 46: ...The Force 2 Stage Operation Manual 46 Revision Date 4 23 2019...
Page 47: ...The Force 2 Stage Operation Manual 47 Revision Date 4 23 2019...
Page 48: ...The Force 2 Stage Operation Manual 48 Revision Date 4 23 2019 7 5 Appendix E CO2 Phase Diagram...
Page 53: ...The Force 2 Stage Operation Manual 53 Revision Date 4 23 2019...
Page 54: ...The Force 2 Stage Operation Manual 54 Revision Date 4 23 2019...
Page 55: ...The Force 2 Stage Operation Manual 55 Revision Date 4 23 2019...
Page 56: ...The Force 2 Stage Operation Manual 56 Revision Date 4 23 2019...
Page 57: ...The Force 2 Stage Operation Manual 57 Revision Date 4 23 2019 Z...
Page 58: ...The Force 2 Stage Operation Manual 58 Revision Date 4 23 2019...
Page 59: ...The Force 2 Stage Operation Manual 59 Revision Date 4 23 2019...
Page 60: ...The Force 2 Stage Operation Manual 60 Revision Date 4 23 2019...
Page 61: ...The Force 2 Stage Operation Manual 61 Revision Date 4 23 2019...
Page 62: ...The Force 2 Stage Operation Manual 62 Revision Date 4 23 2019...
Page 63: ...The Force 2 Stage Operation Manual 63 Revision Date 4 23 2019...
Page 64: ...The Force 2 Stage Operation Manual 64 Revision Date 4 23 2019...
Page 65: ...The Force 2 Stage Operation Manual 65 Revision Date 4 23 2019...
Page 66: ...The Force 2 Stage Operation Manual 66 Revision Date 4 23 2019...
Page 67: ...The Force 2 Stage Operation Manual 67 Revision Date 4 23 2019...