The Force™ 2-Stage Operation Manual
49
Revision Date 4/23/2019
7.6. Appendix F. Pre-Training Checklist
In preparation for training please refer to the installation manual for unpacking and set up instructions. Below is
a checklist of what needs to be purchased or completed BEFORE scheduling your onsite training. Onsite
training is a four hour block of instruction that is NOT designed to include unpacking and set up. Incomplete
items at the time of onsite training will result in incomplete training or additional charges for rescheduling.
Our training process is as follows:
1.
Customers to reference the installation manual for instructions on un-crating and system set up.
2.
Customer to complete entire Pre-Training Checklist. See below.
3.
A FaceTime or Skype session is required
(when available)
to ensure checklist is complete, set up is
correct and cover basic operation and cleaning of the system.
4.
After 1-3 are complete, onsite training can be scheduled. There is a 2-3 week lead time. Schedule your
training online:
http://www.apekssupercritical.com/training/
Pre-Training Checklist:
Below is a checklist of what needs to be purchased or completed BEFORE scheduling your onsite training:
o
Must be complete before scheduling training:
Print complete operation manual and have on site the
day of training, along with the chiller manual.
o
Must be complete before scheduling training:
Apeks system and diaphragm compressor are unpacked
and set up in location of operation. Refer to unpacking instructions in the installation manual.
o
Must be complete before scheduling training
: See installation manual for electrical requirements for
your system. All electrical connections are to be completed before onsite training is scheduled.
o
Must be complete before scheduling training:
Purchase and have on site for training:
o
Bottles of CO
2
, gas feed, check valve free, food grade or better. Minimum requirements are:
o
(3) 50 lb. bottles for 5LD and 5Lx5LD
o
(4) 50 lb. bottles for 20LD
o
(4) 75 lb. bottles for 20Lx20LD
o
Distilled water and Propylene glycol 90/10 mix:
o
Total gallons of mixture needed for system:
o
5LD – 5 gal
o
5Lx5LD – 6 gal
o
20LD – 7 gal
o
20Lx20LD – 9 gal
o
190 or higher proof ethanol
Summary of Contents for THE FORCE 2-STAGE
Page 21: ...The Force 2 Stage Operation Manual 21 Revision Date 4 23 2019 2 2 9 3 PLC Analog Inputs...
Page 22: ...The Force 2 Stage Operation Manual 22 Revision Date 4 23 2019 2 2 9 4 PLC Analog Outputs...
Page 46: ...The Force 2 Stage Operation Manual 46 Revision Date 4 23 2019...
Page 47: ...The Force 2 Stage Operation Manual 47 Revision Date 4 23 2019...
Page 48: ...The Force 2 Stage Operation Manual 48 Revision Date 4 23 2019 7 5 Appendix E CO2 Phase Diagram...
Page 53: ...The Force 2 Stage Operation Manual 53 Revision Date 4 23 2019...
Page 54: ...The Force 2 Stage Operation Manual 54 Revision Date 4 23 2019...
Page 55: ...The Force 2 Stage Operation Manual 55 Revision Date 4 23 2019...
Page 56: ...The Force 2 Stage Operation Manual 56 Revision Date 4 23 2019...
Page 57: ...The Force 2 Stage Operation Manual 57 Revision Date 4 23 2019 Z...
Page 58: ...The Force 2 Stage Operation Manual 58 Revision Date 4 23 2019...
Page 59: ...The Force 2 Stage Operation Manual 59 Revision Date 4 23 2019...
Page 60: ...The Force 2 Stage Operation Manual 60 Revision Date 4 23 2019...
Page 61: ...The Force 2 Stage Operation Manual 61 Revision Date 4 23 2019...
Page 62: ...The Force 2 Stage Operation Manual 62 Revision Date 4 23 2019...
Page 63: ...The Force 2 Stage Operation Manual 63 Revision Date 4 23 2019...
Page 64: ...The Force 2 Stage Operation Manual 64 Revision Date 4 23 2019...
Page 65: ...The Force 2 Stage Operation Manual 65 Revision Date 4 23 2019...
Page 66: ...The Force 2 Stage Operation Manual 66 Revision Date 4 23 2019...
Page 67: ...The Force 2 Stage Operation Manual 67 Revision Date 4 23 2019...