
90
EN
ADJUSTMENT OF THE BOWL FRICTION WHEELS
The central bowl guide assembly is composed of one bowl friction wheel. Its position has been perfectly adjusted
during the machine assembly and testing phases.
However, should it be necessary to adjust the position of the bowl friction wheel on the bowl rim, proceed in the following
manner:
-
with the machine head completely open, remove the side panel on the machine, to gain access to the thrust roller
assembly;
-
loosen the fastening screw on the upper support of the bowl friction wheel shaft;
-
loosen the fastening screw on the lower support of the bowl friction wheel shaft;
-
move the bowl friction wheel forwards or backwards, as required, by using the upper and lower adjustment screws
which move the relative supports;
-
fasten the upper and lower screw of the corresponding upper and lower support.
Bowl
friction
wheel shaft
Bowl
friction
wheel
Adjustment
screw for
lower
support
Upper
shaft
support
Lower
shaft
support
Fastening screw
for upper shaft
support
Fastening screw
for lower shaft
support
Adjustment
screw for
upper
support
Summary of Contents for BAKERY Line L 120
Page 2: ...RU O KATHO L 80 120 2 2020 2 400 50 3 8 75 A 22 1 CE Equip Group...
Page 4: ...4 RU 1 2 3 4 5 6 I II...
Page 5: ...5 RU 1...
Page 6: ...6 RU...
Page 7: ...7 RU 2 GOST R GOST R 2 2...
Page 8: ...8 RU 3 N B 4...
Page 9: ...9 RU 70 A...
Page 10: ...10 RU 4...
Page 11: ...11 RU 5 55 2 2 9 10 4 13 5 3 8 6 12 1 7 11...
Page 12: ...12 RU 1 2 3 5 3 3 4 5 5 13 80 120 13 160 280 10 6 7 11 8 9 2 9 12...
Page 13: ...13 RU 2 1 6 20 40 C 90...
Page 14: ...14 RU 7 800 800 A 4...
Page 15: ...15 RU 4 4 a M16 4 10 12 A A A...
Page 16: ...16 RU 3 A A A M5 M5...
Page 17: ...17 RU 5 40 C 90 8...
Page 18: ...18 RU 9 2 2 1 2 3 1...
Page 19: ...19 RU O...
Page 20: ...20 RU 10 O...
Page 21: ...21 RU O...
Page 23: ...23 RU 3...
Page 24: ...24 RU 11 11 1 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Page 25: ...RU 11 2 EV4 EV3 EV1 EV2 SP1 SP2 90 EV SP1 SP2 25...
Page 26: ...26 RU 12 1 1 2 3 2 I 3 4 4 5 5 1 1 2 2 1 1 1 1 2 2 1 1 2 2 13 PET ABS PST o o...
Page 27: ...27 RU 1...
Page 28: ...28 RU Reverse 1 NORMAL...
Page 29: ...29 RU...
Page 30: ...30 RU 1 LED 1 2 LED 1 1 2 2 LED 1 1 O 1 2...
Page 31: ...31 RU 1 2 1 1 1 O 1 2 2 2...
Page 32: ...32 RU 1 2 1 1 O 1 1 2 2 2 2 2...
Page 33: ...33 RU 1 2 Reverse 1 1 5 2 backup O 1 2...
Page 36: ...36 RU 3...
Page 37: ...37 RU...
Page 38: ...38 RU B C B C A A I II...
Page 39: ...39 RU 6 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Page 41: ...41 RU 2a C 4...
Page 42: ...42 RU 5 6 3000 5000 5000 10000 10000 5 1 80 15 20...
Page 43: ...43 RU 1 1 2 3 2 5 11 4 3 4 5 5 6 7 6 8 9 10 7 11 8 9 10 11 12 12 13 5 14 9 15 13 6 14 15...
Page 45: ...45 RU...
Page 76: ...76 EN DESCRIPTION OF THE ELECTRONIC CONTROL PANEL...
Page 98: ...98 EN HYDRAULIC WIRING DIAGRAM...
Page 101: ...101 EN...
Page 102: ...102 EN...
Page 103: ...103 EN...
Page 109: ...109 EN 2 ASSIEME RUOTA FRIZIONE L 80 120 EXPLODED VIEW FOR FRICTION WHEEL L 80 120...
Page 111: ...111 EN 3 ASSIEME GRUPPO SPIRALE EXPLODED VIEW OF SPIRAL GROUP...
Page 117: ...117 EN 8 ASSIEME BASAMENTO BASE ASSEMBLY...
Page 119: ...119 EN 9 ASSIEME IMPIANTO IDRAULICO HYDRAULIC SYSTEM ASSEMBLY...
Page 121: ...121 EN 10 ASSIEME PANNELLO COMANDI CONTROL PANEL ASSEMBLY...
Page 123: ...123 EN 11 ASSIEME CARRELLO BOWL TROLLEY ASSEMBLY...
Page 126: ...Equip Group 125080 2 7 495 234 00 33 http equipgroup ru http bakery apach it...