
69
EN
WEEKLY, MONTHLY, ANNUAL Maintenance procedures
WEEKLY MAINTENANCE:
Clean the machine thoroughly.
Check that the operating controls and external emergency devices (Emergency
button, protective mobile bowl cover and lateral emergency bars) function correctly.
Check the external components of the machine: spiral tool, breaking column,
bowl.
MONTHLY MAINTENANCE:
Lubricate the bearings, if necessary.
Check the tension of the belts.
Check the transmissions for irregular noises.
Check the tightness of the spiral and breaking column bolts (refer to the table
of bolt tightening torques below)..
Check the efficiency of the gas struts, for models using these components to
control the opening of the mobile bowl cover, and replace them if necessary.
ANNUAL MAINTENANCE:
Check the electrical system.
Clean the machine and check it thoroughly (both externally and that it functions
correctly).
Thoroughly check the transmission members.
o
The transmission belts must be replaced when they start to fray or when under
excessive tension, before they actually break. It is necessary to replace the entire set of
belts relative to a transmission, even if only one of the belts requires replacement.
o
The bearings are subject to wear, especially under the following conditions: poor
cleaning procedures, excessive use of the machine in first speed in the reverse direction,
poor use of the machine which can lead to food products being deposited inside the
group of bearings therefore reducing the life of the bearings themselves. The
replacement of the bearings must be carried out by a suitably qualified technician using
appropriate equipment and in full observance of the safety measures and local safety
regulations.
o
Check the tightness of the bolts on the entire machine.
Indicative Bolt tightening torques
Nominal Size thread
M6
M8
M10
M12
M14
M16
Tightening for Bolts (8.8) [Nm]:
9.7
23
47
80
130
196
Tightening for Bolts (10.9) [Nm]:
13.6
33
64
113
180
275
Tightening for Stainless steel Bolts
[Nm]:
6
16
32
56
-
135
Summary of Contents for BAKERY Line L 120
Page 2: ...RU O KATHO L 80 120 2 2020 2 400 50 3 8 75 A 22 1 CE Equip Group...
Page 4: ...4 RU 1 2 3 4 5 6 I II...
Page 5: ...5 RU 1...
Page 6: ...6 RU...
Page 7: ...7 RU 2 GOST R GOST R 2 2...
Page 8: ...8 RU 3 N B 4...
Page 9: ...9 RU 70 A...
Page 10: ...10 RU 4...
Page 11: ...11 RU 5 55 2 2 9 10 4 13 5 3 8 6 12 1 7 11...
Page 12: ...12 RU 1 2 3 5 3 3 4 5 5 13 80 120 13 160 280 10 6 7 11 8 9 2 9 12...
Page 13: ...13 RU 2 1 6 20 40 C 90...
Page 14: ...14 RU 7 800 800 A 4...
Page 15: ...15 RU 4 4 a M16 4 10 12 A A A...
Page 16: ...16 RU 3 A A A M5 M5...
Page 17: ...17 RU 5 40 C 90 8...
Page 18: ...18 RU 9 2 2 1 2 3 1...
Page 19: ...19 RU O...
Page 20: ...20 RU 10 O...
Page 21: ...21 RU O...
Page 23: ...23 RU 3...
Page 24: ...24 RU 11 11 1 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Page 25: ...RU 11 2 EV4 EV3 EV1 EV2 SP1 SP2 90 EV SP1 SP2 25...
Page 26: ...26 RU 12 1 1 2 3 2 I 3 4 4 5 5 1 1 2 2 1 1 1 1 2 2 1 1 2 2 13 PET ABS PST o o...
Page 27: ...27 RU 1...
Page 28: ...28 RU Reverse 1 NORMAL...
Page 29: ...29 RU...
Page 30: ...30 RU 1 LED 1 2 LED 1 1 2 2 LED 1 1 O 1 2...
Page 31: ...31 RU 1 2 1 1 1 O 1 2 2 2...
Page 32: ...32 RU 1 2 1 1 O 1 1 2 2 2 2 2...
Page 33: ...33 RU 1 2 Reverse 1 1 5 2 backup O 1 2...
Page 36: ...36 RU 3...
Page 37: ...37 RU...
Page 38: ...38 RU B C B C A A I II...
Page 39: ...39 RU 6 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Page 41: ...41 RU 2a C 4...
Page 42: ...42 RU 5 6 3000 5000 5000 10000 10000 5 1 80 15 20...
Page 43: ...43 RU 1 1 2 3 2 5 11 4 3 4 5 5 6 7 6 8 9 10 7 11 8 9 10 11 12 12 13 5 14 9 15 13 6 14 15...
Page 45: ...45 RU...
Page 76: ...76 EN DESCRIPTION OF THE ELECTRONIC CONTROL PANEL...
Page 98: ...98 EN HYDRAULIC WIRING DIAGRAM...
Page 101: ...101 EN...
Page 102: ...102 EN...
Page 103: ...103 EN...
Page 109: ...109 EN 2 ASSIEME RUOTA FRIZIONE L 80 120 EXPLODED VIEW FOR FRICTION WHEEL L 80 120...
Page 111: ...111 EN 3 ASSIEME GRUPPO SPIRALE EXPLODED VIEW OF SPIRAL GROUP...
Page 117: ...117 EN 8 ASSIEME BASAMENTO BASE ASSEMBLY...
Page 119: ...119 EN 9 ASSIEME IMPIANTO IDRAULICO HYDRAULIC SYSTEM ASSEMBLY...
Page 121: ...121 EN 10 ASSIEME PANNELLO COMANDI CONTROL PANEL ASSEMBLY...
Page 123: ...123 EN 11 ASSIEME CARRELLO BOWL TROLLEY ASSEMBLY...
Page 126: ...Equip Group 125080 2 7 495 234 00 33 http equipgroup ru http bakery apach it...