![Anviz VP30 Owner'S Manual Download Page 95](http://html.mh-extra.com/html/anviz/vp30/vp30_owners-manual_2948698095.webp)
Pic5.6 Attendance Calculating and Report
Select the beginning, the ending date and the department and staff that need to be
calculated and then click [Calculate].
There are four Tabs of information after search and calculation which can be
viewed respectively:
[Attendance Exceptions]: Display the dealt result of the original attendance
records;
[Shift Exceptions]: Display Staff’s attendance result in the scheduled time period;
[Other Exceptions]: Display Staff’s leave, out and overtime etc.;
[Calculated Items]: Display all Staff’s calculated items such as “normal”, “actual”,
“late”, “early”, “absent”, “overtime” etc.
Please note: When dealing with “Out” calculation, there should be “Out back” and
only “Out” and “Out back” in one shift can be calculated.
Working hours in the report=”Actual” -”Late”-”Early”-”Out”
Exceptions of attendance records dealt with:
Open the attendance exceptions option card to deal with the records:
86