2.8 Wiring the Power Inputs

Caution: Please follow the steps below when inserting the power wire.

Attention: Veuillez suivre les étapes ci-dessous lors de l'insertion du câble d'alimentation.

1. Insert the positive and negative wires into the PWR1 (V1+, V1-) and PWR2 (V2+, V2-) contacts on the terminal block

connector as shown below in Figure 2.6.

Figure 2.6 - Power Terminal Block

2.

Tighten the wire-clamp screws to prevent the wires from loosening, as shown below in Figure 2.7.

7

Summary of Contents for LNX-800A-E Series

Page 1: ...LNX 800A E Series 8 Port Industrial Unmanaged Ethernet Switch with 8 10 100Tx Ports 12 48VDC Power Input E mark Version Hardware Manual Version 1 0 September 2021 ...

Page 2: ... the product described in this manual without prior notice Antaira Technologies LLC will not be liable for any technical inaccuracies or typographical errors found in this guide Changes are periodically made to the information contained herein and will be incorporated into later versions of the manual The information contained is subject to change without prior notice FCC Warning This equipment ha...

Page 3: ...férence ne se produira dans une installation particulière Si cet équipement provoque des interférences nuisibles à la réception radio ou télévision ce qui peut être déterminé en éteignant puis en rallumant l équipement l utilisateur est encouragé à essayer de corriger les interférences par une ou plusieurs des mesures suivantes Réorientez ou déplacez l antenne de réception Augmentez la distance en...

Page 4: ...ndustrial Grade Unmanaged Ethernet Switches Hardware Manual Version 1 0 September 2021 The manual supports the following models LNX 800A E LNX 800A E T This document is the current official release hardware manual Please check our website www antaira com for any updated manual or contact us by e mail support antaira com ...

Page 5: ... 2 1 Physical Dimensions 3 2 2 Front View Panel 4 2 3 Top View Panel 5 2 4 LED Indicators 5 2 5 Ethernet Ports 6 2 6 Cabling 6 2 8 Wiring the Power Inputs 7 2 9 Wiring the Fault Alarm Contact 8 2 10 Grounding Note 9 3 Mounting Installation 10 3 1 DIN Rail Mounting 10 3 2 Wall Mounting 11 4 Hardware Installation 13 4 1 Installation Steps 13 4 2 Maintenance and Service 14 4 3 Troubleshooting 14 5 Te...

Page 6: ... the built in Network Broadcast Storm Protection and built in relay warning function will alert network engineers whenever there is a power failure or port break With an increasing demand for E Mark certified products not only for the EU but also the Middle East and African markets this product is a perfect solution for easy network deployment in various vehicular environments 1 1 Product Hardware...

Page 7: ...par un circuit externe veuillez utiliser un dispositif de protection sur l entrée d alimentation Les spécifications matérielles les ports les informations de câblage et l installation du câblage du commutateur Ethernet industriel seront décrits dans ce manuel d utilisation Warning Labels The caution label means that you should check certain information on the user manual when working with the devi...

Page 8: ...ernet Switches LNX 800A E Series Hardware Manual v1 0 2 Hardware Description 2 1 Physical Dimensions Figure 2 1 below shows the physical dimensions of this product series W x H x D is 30mm x 140mm x 95mm Figure 2 1 Physical Dimensions 3 ...

Page 9: ...Antaira Technologies Industrial Ethernet Switches LNX 800A E Series Hardware Manual v1 0 2 2 Front View Panel Figure 2 2 below shows the front panel of the product series Figure 2 2 Front View Panel 4 ...

Page 10: ...see below in Table 2 1 LED Color Description P1 Green On Power Input 1 is active Off Power Input 1 is inactive P2 Green On Power Input 2 is active Off Power Input 2 is inactive Fault Red On Power Input 1 or 2 is inactive Off Both power input 1 and 2 are active LAN Port 1 8 Green On Connected to network 10 100Mbps Flashing Networking is active Off Not connected to network Green On Ethernet port ful...

Page 11: ...2 RX 6 TX 6 RX Table 2 2 10 100Base T X RJ45 Pin Assignments Note and signs represent the polarity of the wires that make up each wire pair 2 6 Cabling Use the four twisted pair category 5e or the above cabling for the RJ45 port connections The cable between the switch and the link partner switch hub workstation etc must be less than 100 meters 328 ft in length The small form factor pluggable SFP ...

Page 12: ...wer wire Attention Veuillez suivre les étapes ci dessous lors de l insertion du câble d alimentation 1 Insert the positive and negative wires into the PWR1 V1 V1 and PWR2 V2 V2 contacts on the terminal block connector as shown below in Figure 2 6 Figure 2 6 Power Terminal Block 2 Tighten the wire clamp screws to prevent the wires from loosening as shown below in Figure 2 7 7 ...

Page 13: ...s en cuivre 125 C serrez à 5 lb Le calibre des fils du bornier doit être compris entre 18 et 20 AWG 2 9 Wiring the Fault Alarm Contact The fault alarm contact is in the middle of the terminal block connector as the picture shows below in Figure 2 8 By inserting the wires it will detect the fault status including power failure or port link failure managed industrial switch only and form a normal op...

Page 14: ... alimentation connectez les broches 1 à 5 et les broches 2 à 6 pour éliminer l alarme de panne de courant 2 10 Grounding Note Grounding and wire routing help limit the effects of noise due to Electromagnetic Interference EMI Run the ground connection from the ground screw to the grounding surface prior to connecting devices The grounding screw symbol is shown below in Figure 2 9 Figure 2 9 Groundi...

Page 15: ...rear side of the industrial Ethernet switch Caution The torque for tightening the screws on the device is 3 5 in lbs Attention Le couple de serrage des vis sur l appareil est de 3 5 pouces livres 2 To remove the DIN Rail bracket do the opposite from step 1 3 After the DIN Rail bracket is installed on the rear side of the switch insert the top of the DIN Rail on to the track as shown below in Figur...

Page 16: ... industriel 1 Remove the DIN Rail bracket from the industrial Ethernet switch by loosening the screws 2 Place the wall mounting brackets on the top and bottom of the industrial Ethernet switch 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Caution The torque for tightening the screws on the device is 3 5 in lbs Attention Le couple de serrage des vis sur l app...

Page 17: ...trial Ethernet Switches LNX 800A E Series Hardware Manual v1 0 Figure 3 4 Remove DIN Rail bracket from the Switch Below in Figure 3 5 are the dimensions of the wall mounting bracket Figure 3 5 Wall Mounting Bracket Dimensions 12 ...

Page 18: ...f it is required to wall mount the industrial Ethernet switch please refer to the Wall Mounting section for wall mounting installation 3 To hang the industrial Ethernet switch on a DIN Rail or wall please refer to the Mounting Installation section 4 Power on the industrial Ethernet switch and then the power LED light will turn on For the help on how to wire power please refer to the Wiring the Pow...

Page 19: ...is being used Never use a power supply or adapter with a non compliant DC output voltage or it will burn the equipment Select the proper UTP or STP cable in order to construct the network Use an unshielded twisted pair UTP or shield twisted pair STP cable for RJ45 connections 100Ω Category 5e for 10 100Mbps Also be sure that the length of any twisted pair connection does not exceed 100 meters 328 ...

Page 20: ...e 14 880pps for 10Base T Ethernet 148 800pps for 100Base T Fast Ethernet MAC Table Size 2K Port Interface Ethernet Port 8 10 100BaseTx Auto negotiation speed Full Half duplex mode and auto MDI MDI X connection LED Indicators System Power 1 Power 2 Fault Ethernet Ports Speed Link Active Protection Network Cable 10Base T 2 pair UTP STP Cat 3 4 5 cable EIA TIA 568 100 ohm 100m 100Base TX 2 pair 2 pai...

Page 21: ...ge Temperature 40 C 85 C Ambient Relative Humidity 5 to 95 non condensing Regulatory Approvals EMI FCC Part 15 Subpart B Class A CE EN55032 EN61000 6 4 Class A EMS CE EN55024 EN61000 6 2 EN61000 4 2 3 4 5 6 8 Free Fall IEC60068 2 32 Shock IEC60068 2 27 Vibration IEC60068 2 6 Green RoHS Compliant Certifications FCC CE E mark Warranty 5 Years Table 5 1 Technical Specifications Antaira Customer Servi...

Page 22: ...thernet Switches LNX 800A E Series Hardware Manual v1 0 www antaira com support antaira com www antaira eu info antaira eu www antaira com tw info antaira com tw Any changes to this material will be announced on the Antaira website 17 ...

Reviews: