Antaira Technologies - Industrial Ethernet Switches
LMP-0800G-24 Series User Manual V1.0
29
[RPL Owner Node]
There is only one RPL Owner Node could be set in a ring network. In order to set up the RPL
Owner Node, choose a switch and enable “Protocol” under the ERPS Configuration interface,
and follow below steps and use
Figure 5.28
, below, as an example:
Step 1:
Choose a specific port from the dropdown box next to “ring port 0”, and set it as
“Owner” node by clicking the dropdown box next to “Role” below “ring port 0”. At
this point, “
Port 1
” was chosen as example.
Step 2:
Choose a specific port from the dropdown box next to “ring port 1”, then set it as
“
None
” from the dropdown box next to “Role” (which locates below “ring port 1”).
At this point, “
Port 2
” was chosen as example.
Note:
The port number of “Ring Port 0” and “Ring Port 1” cannot be duplicated.
After the configurations, press the “Apply” button on the right bottom corner to save the setting.
Please be aware, when the revertive mode is set to “
Yes
”, the ring will recover the same way
as explained in
Figure 5.27
, after the ring state form goes from ABNORMAL to NORMAL in 5
minutes. Otherwise, the blocked port will remain blocked permanently unless users reconfigure
it.
Figure 5.28
– RPL Owner Node Setup Example