Ok if you are feeling ready and you have checked over all your connections then you are ok to
turn on and that is with NO power supply tube installed
You should be able to get 5 voltages with no tube installed
They are as follows:
The three 9V DC voltages on the Super regulator board
The two 6.3V DC voltages on the Filament Board
Figure 38 - Voltage check locations
See the next 2 pages for a printable version of the voltage checks. Now here are the steps to
power on and test power supply
See the graphic on next page to identify these locations, use your voltmeter to measure.
If you are not getting any voltages, make sure you are on DC volts on your meter and if still no
luck check that the Power Switch is in the 1 position against chassis and that the FUSE is not
blown. You can use an ohm meter on the fuse when it is removed and see if it is zero ohms
(working) or Infinite (means fuse has blown).
If things are not working, contact
for the next steps. If all is well
then move on to the next step.
Turn the unit off.
56
Summary of Contents for DAC5.1 Signature
Page 19: ...7 3 4 Connecting the Black wires Figure 5 Black Wires to PCB Followed by the Black wires 15 ...
Page 31: ...Figure 16 Completed Filament Board 27 ...
Page 34: ...Figure 19 Power Supply PCB Schematic 30 ...
Page 46: ...42 ...
Page 47: ...43 ...
Page 49: ...45 ...
Page 50: ...46 ...
Page 51: ...47 ...
Page 62: ...58 ...
Page 72: ...Figure 49 Super Regulator Board to DAC Board 68 ...
Page 80: ...Figure 56 Completed Line Stage Installed 76 ...
Page 97: ...Figure 73 Installed Rotary Switch Outside Figure 74 Installed Rotary Switch Inside 93 ...
Page 101: ...21 DAC5 1 Appendix 97 ...
Page 102: ...98 ...
Page 103: ...99 ...
Page 104: ...100 ...