Installation
16
Warnings before installation
Boiler installation
Boiler installation
The boiler should be positioned in a
frost-proof boiler room. If the boiler
room is on the roof, the boiler itself
may never be the highest point of
the installation.
When positioning the boiler, please
note the recommended minimum
clearance in the picture. When the
boiler is positioned with less free
space, maintenance activities will be
more difficult.
To optimize the position of the boiler
in the room it is possible to exchange
the position of the electrodes from
the right side of the boiler to the left
side of the boiler.
This also means that the required
space as indicated in the picture will
be mirrored.
Normal: Left 250mm / Right 450mm
Modified: Left 450mm / Right 250mm
Once the boiler is in the correct
position, the adjustable feet (2)
(with vibration absorption damp
-
ers) should be adjusted to the right
Installation, first ignition, maintenance and boiler repair, must be performed by qualified
persons, according to the national installation provisions and any requirements of the local
authorities and public health agencies
.
Before installing the appliance
Before connecting the boiler, it is
first necessary to perform the fol
-
lowing operations:
•
Carefully wash the system pip
-
ing in order to remove any screw
thread or welding residues, or
any dirt which might prevent the
boiler from operating correctly;
•
Make sure that the boiler is set
up for operation with the type of
gas available (read the informa
-
tion on the packaging label and
on the boiler data plate);
•
Make sure that there are no ob
-
stacles inside flue exhaust and
that it does not contain any dis
-
charge from other appliances,
unless the flue is meant to serve
more than one boiler (in accord
-
ance with current legal require
-
ments);
•
Where there is already a con
-
nection to existing flue exhausts,
check that these exhausts have
been perfectly cleaned and are
without residues, because any
disconnection could obstruct the
passage of fumes and create po
-
tentially dangerous situations;
•
In areas with particularly hard
water, limescale may build up on
the components inside the boiler
and reduce its overall efficiency;
•
In case of installation near wall
sensitive to heat (for example
wood) make sure to protected it
by suitable insulation;
WARNING!
No flammable items should be left
near the boiler. Make sure the in
-
stallation site and any systems to
which the appliance must be con
-
nected are fully compliant with
the current applicable legislation.
Install the boiler respecting the
minimum distances from any flam
-
mable materials. If dust and/or ag
-
gressive vapours are present in the
room in which it is to be installed,
the appliance must operate in
-
dependently of the air inside the
room.
2
800
250
450
450
height and the boiler should be hor
-
izontal. Ensure that the wheels are
not in contact with the floor!
Water and gas connections should
be done after adjusting the feet, as
they affect the exact height of all
connections.
Summary of Contents for SUPAflo EVO SF60 EVO
Page 1: ...INSTALLATION AND SERVICE MANUAL SUPAflo EVO Water Heater SF60 EVO...
Page 2: ......
Page 15: ...Installation 15 EN Disassemble the casing 7 8 9...
Page 23: ...Installation 23 EN Wiring diagram Boiler...
Page 46: ...Note 46 Note...
Page 47: ...Note 47 EN Note...