Copyright 2021 Ampt LLC.
All rights reserved.
19
V600-12 String Optimizer Platform
Installation Manual: 57070013-1 H
Chapter 3:
Installing the String Optimizer
Getting Started
This chapter addresses the proper mounting and installation of the Ampt String Optimizer. Read
the entire chapter before starting the procedures and then conduct each task in the order
given.
Parts and Tools Needed
•
The mounting hardware and tools vary by the type of PV module mounting rail.
•
Voltmeter
(rated for the PV system’s maximum system voltage)
with DC current clamp.
•
Amphenol Sealing Caps
–
H4 or UTX
H4 Sealing Cap (for female)
H4PF
UTX Sealing Cap (for female)
UTXF
H4 Sealing Cap (for male)
H4PM
UTX Sealing Cap (for male)
UTXM