Copyright 2021 Ampt LLC.
All rights reserved.
7
V600-12 String Optimizer Platform
Installation Manual: 57070013-1 H
Before You Begin
Handling and Storage
•
Store optimizers in a clean, dry area that is protected from weather exposure and
pooling water (-30 to 80°C. Relative humidity < 80%).
•
Leave the product in its original packing box until you are ready to install.
•
Do NOT stack pallets.
•
Do NOT lift, carry, or otherwise handle the optimizers by their connectors.
•
Leave connector caps in place until the optimizers are ready to be connected to protect
the optimizer from water and debris ingress.
•
Do NOT transport optimizers that are removed from original packaging. If the original
packaging is no longer available, use a similar box to protect the connectors and heat
sink fins.
Quick Reference and Best Practices
NOTICE
The last page of this manual has a quick reference sheet for making electrical
connections as well as a list of best practices. This information is meant to be
used as a reference on the job site to ensure the electrical connection order and
to avoid damage to the device after the installer has read this manual.
Using Optional Wireless Communication
NOTICE
If the String Optimizers are being used with optional wireless communication,
then refer to the Ampt Communication Unit (Ampt CU) manual for important
requirements related to the String Optimizer installation.