Operat ion and Maintenance M a n u a l
QTS Series Twin Screw Positive Displacement Pump
A
B
O
U
T
T
H
I
S
M
AN
U
A
L
General Information
Every QTS pump is completely assembled, lubricated, synchronized, factory tested, and ready
for use. Standard maintenance practices are described in this manual. For more information,
please see the Maintenance section. Following these guidelines will grant a long pump service
life under proper use and installation in a properly designed system.
If it is necessary to return the equipment under warranty, or for some other reason, contact Ampco
Pumps to receive a Return Material Authorization ( RMA).
Damage or loss during shipment
If you receive the equipment in poor condition or it is lost during transport, file a claim with
the carrier immediately. The transport service provider is responsible for recovering the goods;
Ampco Pumps will ensure they are received in good condition.
Receiving the pump
The pump inlet and outlet ports are covered prior to shipment to ensure that no foreign materials
enter the pump during shipping. If the protective covers are missing at delivery, remove the pump
cover and inspect the interior to ensure that it is free of contaminants before starting up the
pump. Please keep the pump serial number; this will help to order replacement parts and / or
make a warranty claim. For more information related to shipping damage and warranty claims
please review the General Information or Warranty section in this manual.
4
Ampco Pumps Company QTS Manual M-030 Rev A 1.16