11
-
9
11.12 PTO Driveline Servicing
The first lubrication interval should be 16 to 24 hours of operation after initial startup. After that, follow
the schedule outlined in Table 11
-
1.
NOTE:
A 1% Molybdenum disulfide grease should be used for the grease points listed below.
Table 11
-
1: PTO Driveline Servicing
Figure 11
-
9: PTO Shaft
*Constant angle applications must have a lube interval of 4 hours.
NOTE:
Replacement parts are not lubricated. They must be lubricated at the time of assembly. After
that, use the recommended frequency and quantity for each location.
Description
Frequency
Quantity
Instances
Cross and bearings*
8 hours
2
-
3 pumps
3
Telescoping members
8 hours
8
-
10 pumps
1
CV ball and socket*
8 hours
2 pumps
1
CV center housing*
24 hours
2 pumps
1
Summary of Contents for 2720
Page 2: ...i This page is intentionally left blank ...
Page 4: ...iii This page is intentionally left blank ...
Page 49: ...7 20 Figure 7 38 Rear Scrub shown with Scrub Chain Rollers and Head Shafts 7 23 Rear Scrub ...
Page 63: ...11 7 1 2 3 4 5 6 7 A B B 1 2 3 5 5 4 7 6 ...
Page 64: ...11 8 ...