
23
Click to return to the contents section
Finishing
Plaster finishing - full plaster
skim coat
• Block the port to prevent plaster
entering.
The port can be blocked with cloth,
bubblewrap or a shape cut from
cardboard.
The working environment must be dry
enough to allow the plaster finish coat to
dry within 24 hours, not days.
• Apply plaster skim coats to the entire
wall surface and across the ALF100SM
cabinet face.
Operation of the ALF100SM is not
affected by plaster thickness.
When the plaster has begun to set,
remove the blockage from the port
opening.