![amiad Filtomat MG-110P Installation, Operation And Maintenance Instructions Download Page 30](http://html.mh-extra.com/html/amiad/filtomat-mg-110p/filtomat-mg-110p_installation-operation-and-maintenance-instructions_2932266030.webp)
MG110P
7.2013
Page 30 of 51
INPUTS OUTPUTS
00 ------00
Inputs:
Left digit - DP sensor status:
0= no DP signal
1= DP signal is present
Right digit – Pause input status:
0=no Pause signal
1= Pause signal is present
Outputs:
The first 6 digits from the left show the status of the filters, the main valve and the delay
valve outputs:
0= The output is switched off
1= The output is switched on
-
= There is no solenoid connected to this output
Digit number 7 (from left) – Alarm signal:
0= No Alarm signal (the Alarm output is switched off)
1= Alarm signal (the Alarm output is switched on)
Digit number 8 (from left) – End of Cycle (sequence) signal:
0= The Sequence signal is off
1= The Sequence signal is on and being sent to activate the flushing process of
another controller.
19
To finish press
<ENTER>
Press Enter to exit the Configuration process and return to the Main
Screen
(
to
Screen number 1
)
.
Notes:
This is the only exit point of the configuration process, navigate
to this screen and press Enter to terminate it.
The controller begins automatic operation only after exiting
the Configuration process!!!
F. Flushing program
Once the controller is properly configured and the real time clock is set it is necessary to enter a flushing program in order
for the actual operation of the controller to start.
The layout of the screens involved in the Flushing program entry can be found on page 10 of this manual. The following
table describes each one of the screens of the Flushing program and it contains three columns.
The first column shows the screen number as appears at the upper left corner of the screen drawing in the
layout diagram on page 10 of this manual.
The second column shows the default setting of the screen.
The third column explains the controller-task controlled by this screen.
Note:
Do not change the program while flushing, stop the flushing first.
Summary of Contents for Filtomat MG-110P
Page 5: ...MG110P 7 2013 Page 5 of 51 DIMENSIONAL DRAWINGS www irrigationglobal com ...
Page 37: ...MG110P 7 2013 Page 37 of 51 I O Terminal Connections Drawing ...
Page 42: ...MG110P 7 2013 Page 42 of 51 PARTS DRAWING 1 Page 1 ...
Page 43: ...MG110P 7 2013 Page 43 of 51 PARTS DRAWING 1 Page 2 ...
Page 45: ...MG110P 7 2013 Page 45 of 51 PARTS DRAWING 2 ...
Page 47: ...MG110P 7 2013 Page 47 of 51 PARTS DRAWING 3 www irrigationglobal com ...