7
Lay down two columns on the installation site parallelly, position the powerside
column according to the actual installation site and install top plate, top connecting
plate assy. Usually, it is suggested to install powerside column on the front-right side
from which vehicles are driven to the lift
(See Fig. 12)
.
E. Connecting the cables
1
.
Put down columns and then push the carriages higher than chain pulley
(See Fig. 13).
2
.
Install cable
(See Fig. 14).
Car-in direction
Powerside column
Offside column
Install top plate with
M12*30 hex bolt, nut
and lock washer
Fig. 13
B,
Push the carriages higher than chain
pulley, cable pass through the top of the
carriages and pass through the hole of the
bottom steel plate of the carriages
C,
Pull out the cable
A,
Cable passes into the carriage
Fig. 12
Summary of Contents for A245LX
Page 1: ...TWO POST LIFT Model A245LX...
Page 4: ...2 Arm Swings View For Model A245LX Fig 2...
Page 10: ...8 F Assembly oil hose assy See Fig 15 Fig 14...
Page 25: ...23 Model A245LX Cylinders Fig 38 Car in...
Page 26: ...24 Control Box SPX ELECTRIC POWER UNIT 220V 50HZ single phase Fig 39 Fig 40...
Page 39: ...37 Manual Part NO 72222701 Revision date 04 2013 72226604 10 2015...