3
II. INSTALLATION REQUIREMENT
A. TOOLS REQUIRED
Rotary Hammer Drill (Φ19)
Hammer
Level Bar
English Spanner (12")
Wrench set
(10
#
, 13
#
, 14
#
, 15
#
, 17
#
, 19
#
, 24
#
, 27
#
)
Carpenter’s Chalk
Screw Sets
Tape Measure (7.5m)
Pliers
Socket Head Wrench
(4
#
、5
#
、6
#
)
Fig. 3
B. SPECIFICATIONS OF CONCRETE
(See Fig. 4).
Summary of Contents for A245LX
Page 1: ...TWO POST LIFT Model A245LX...
Page 4: ...2 Arm Swings View For Model A245LX Fig 2...
Page 10: ...8 F Assembly oil hose assy See Fig 15 Fig 14...
Page 25: ...23 Model A245LX Cylinders Fig 38 Car in...
Page 26: ...24 Control Box SPX ELECTRIC POWER UNIT 220V 50HZ single phase Fig 39 Fig 40...
Page 39: ...37 Manual Part NO 72222701 Revision date 04 2013 72226604 10 2015...