4
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 100mm minimum and without reinforcing steel bars,
and must be dried totally before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm²) minimum.
3. Floors must be level and no cracks.
C. POWER SUPPLY
The electrical source must be 3HP minimum. The source cable size must be 2.5mm²
and in good condition of contacting with floor.
III
.
STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B.
Use a carpenter’s chalk line to establish installation layout of baseplate
(See Fig. 5)
.
Fig. 5 Model A245LX
C. Check the parts before assembly.
71
Click line
Concrete intensity must be 3000psi
(210Kg/cm
2
) minimum
Fig.4
Summary of Contents for A245LX
Page 1: ...TWO POST LIFT Model A245LX...
Page 4: ...2 Arm Swings View For Model A245LX Fig 2...
Page 10: ...8 F Assembly oil hose assy See Fig 15 Fig 14...
Page 25: ...23 Model A245LX Cylinders Fig 38 Car in...
Page 26: ...24 Control Box SPX ELECTRIC POWER UNIT 220V 50HZ single phase Fig 39 Fig 40...
Page 39: ...37 Manual Part NO 72222701 Revision date 04 2013 72226604 10 2015...