7
C. Equipment layout and oil hose installation
Layout the equipment on the selected location according to
Fig 10
, and connect the oil
hose according to
Fig.11
.
Note: Shutoff valves should be at the working condition(
Fig. 30
)
Oil hose installation
Fig. 11
Main Cylinder I
Secondly Cylinder I
Main Cylinder II
Secondly cylinder II
P 1
P2
29-1/2”
P1
P2
Fig.10
○
1 1/4*146-1/2”
○
2 1/4*140-1/2”
○
3 1/4*137”
○
4 1/4*186-1/4”
○
5 1/4*193-3/4”
○
6 1/4*196”