24
VII. MAINTENANCE SCHEDULE
Monthly:
1. Re-torque the anchor bolts to 150Nm.
2. Lubricate all moving parts with lubricant.
3. Check all fittings, bolts and pins to insure proper mounting.
4. Make a visual inspection of all hydraulic hoses for possible wear or leakage.
5. Adjusting the lifting level on both platforms.
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or damage.
2. Check and adjust the platform as necessary to insure level lifting.
3. Check all fastener and re-torque.
Down
Lower Alarm
Button(pass)
Buzzer
Panel Lock
Power Indicator
Fig. 30
UP
Greasing