- 14 -
J. Install cables
1. Pass through the cables from the platform to the columns according to the number of the
cables
(See Fig. 26).
No.
Cable
○
1
○
2
○
3
○
4
Model
Length
(w/ fitting)
148-5/8
”
406-1/2
”
211-3/4
”
343
”
PRO-12
PRO-12A
151-1/2”
409-1/2”
214-3/4”
345-7/8”
PRO-12AX
A
D
B
C
55
56
57
58
Fig. 26
A
B
C
D
Summary of Contents for PRO-12
Page 1: ...Four Post Lift Model PRO 12 PRO 12A PRO 12AX Original...
Page 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Page 24: ...23 IV EXPLODED VIEW Model PRO 12 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Page 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...