- 4 -
×
√
B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal temperature,
ventilated and dry place.
C. The equipment should be unload and transfer by forklift.
D. SPECIFICATIONS OF CONCRETE
(See Fig. 5)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 4’’ minimum and without reinforcing steel bars
,
and must be
dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000 psi (210kg/cm²)
minimum.
3. Floors must be level and no cracks.
E. AIR SUPPLY
Air pressure requirement: 0.5Mpa~0.8Mpa, Air line size
¢
8
×¢
6 and
¢
6
×¢
4.
F. POWER SUPPLY
The electrical source must be 2.0HP minimum. The source cable size must be 2.5mm² and in
good condition of contacting with floor.
Fig. 5
Fig. 4
≥4’’
Summary of Contents for PRO-12
Page 1: ...Four Post Lift Model PRO 12 PRO 12A PRO 12AX Original...
Page 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Page 24: ...23 IV EXPLODED VIEW Model PRO 12 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Page 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...