- 20 -
4. Connecting Oil-water separator and Manual control air valve using air line
(See Fig. 41)
.
5. Connecting air inlet (Air supply pressure 5 kg/cm
2
- 8 kg/cm
2
), adjusting the air pressure of
Oil-water separator to 0.8 MPa
(See Fig. 42)
.
Connecting Oil-water
separator and Manual
control air valve using
black air line
8*
6
Oil-water
separator
Fig. 41
Black Air pipe
¢6×¢
4
Fig. 42
Clockwise to increase
the air pressure
Counter-clockwise to reduce
the air pressure
Adjusting the air pressure to
0.8 MPa
Connecting air inlet
72
Manual control air valve
Summary of Contents for PRO-12
Page 1: ...Four Post Lift Model PRO 12 PRO 12A PRO 12AX Original...
Page 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Page 24: ...23 IV EXPLODED VIEW Model PRO 12 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Page 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...