N. Install Electrical System
Connect the power source on the data plate of Motor.
Note: 1. For the safety of operators, the power wiring must contact the floor well.
2. Pay attention to the direction of rotations when using 380V, three phase motors.
Single phase motor
(See Fig. 43)
.
1. Connecting the two power supply lines (fire wire
L
and zero wire
N
) to terminals of AC
contactor marked
L1, L2
respectively.
2. Connecting the two motor wires to terminals of AC contactor marked
T1, T2
.
3. Connecting
A2
of AC contactor to
L2
.
4. Connect the two push button wires to the terminals of AC contactor marked A1, L1.
O. Install spring and safety cover of cross beam
(See Fig. 44)
.
Fig. 44
3-3
3-8
40
3-2
Fig. 43
Push button
AC contactor
Summary of Contents for PRO-12
Page 1: ...Four Post Lift Model PRO 12 PRO 12A PRO 12AX Original...
Page 10: ...9 D Install cross beams See Fig 14 Fig 15 Fig 14 Fig 15 2 Hole towards inside 1 3 3...
Page 24: ...23 IV EXPLODED VIEW Model PRO 12 1 2 3 8 18 44 203 32 49 12 50 51 52 53 45 Fig 46 4...
Page 31: ...30 3 Power unit 071102 exploded view 220V 60HZ Single Phase Fig 50...