8
A01-00119 Rev. B
1.0 INSTALLATION
This chapter deals with the installation of the UPS, including unpacking
and checking for shipping damage, installation environment, installation
tools, selection of input & output conductors, installation procedure,
installation preparations, mechanical installation, battery cabinet
installation, etc. Before installing, please become familiar with the
safety standards in the installation illustration.
Unpacking and Checking
Unpack the UPS and conduct the following items:
• Inspect the UPS for shipping damage. If any shipping damage has
occurred, report it to the carrier and your Powervar Representative
immediately. Please provide photos of the UPS damage and we
will be happy to take the appropriate action. Be sure and save all
shipping paperwork
• Check the packing list to ensure that all peripherals are accounted
for and correct for the application. If there is any discrepancy,
make notations and contact your Powervar Representative
immediately.
Environment
The final UPS installation location should meet the following requirements:
• The temperature and humidity should be within the range of
0–40°C and 0%–95% respectively.
• Do not install the UPS in a location where the working
environment has metal conductive dust.
• Don’t install UPS outdoors or in the open air. UPS installation
should be within the specification of the UPS.
• Install the UPS in a climate-controlled environment that with good
ventilation and free of dust, volatile gases, salt, and corrosive
materials. Keep the UPS away from water, any heat source,
flammable and explosive substances. Avoid direct sunlight.
Summary of Contents for Powervar 3400 Series
Page 1: ...3400 Series UPS User s Manual 80 100 125kVA ...
Page 9: ...9 A01 00119 Rev B Tools Tools ...
Page 26: ...26 A01 00119 Rev B Figure 2 5 Normal System operation Figure 2 6 System on battery ...
Page 64: ...64 A01 00119 Rev B 9 0 PRODUCT DRAWINGS ...
Page 65: ...65 A01 00119 Rev B ...
Page 66: ...66 A01 00119 Rev B ...
Page 67: ...67 A01 00119 Rev B ...