Installation & Start-Up
|
3-1
INSTALLATION
This chapter shows you how to install your CG1000-RTP oxygen analyzer.
It includes the following:
•
Inspect Shipping Contents
•
Mechanical Installation
- Sample gas requirements
- Sample gas set-up
- Calibration gas set-up
- PPM measurement suggestions
•
Electrical Installation
- Current output connections
- Alarm contact connections
- RS-232 communications
- Select 115/230 Volt operation
•
Start-Up and User Interface
There are no operator-serviceable components inside the CG1000-
RTP. Never open the analyzer cover. Refer servicing to qualified
personnel.
Remove any packing material from the sensor and control unit. Check
for damage. If any damage is found, notify the shipper.
NOTE
Summary of Contents for Dycor CG1000-RTP
Page 1: ...Dycor CG1000 RTP User Manual Thermox 150 Freeport Road Pittsburgh PA 15238 PN 90355VE Rev N...
Page 12: ...xii Dycor CG1000 RTP Oxygen Analyzer This page intentionally left blank...
Page 18: ...1 6 Dycor CG1000 RTP Oxygen Analyzer This page intentionally left blank...
Page 34: ...3 14 Dycor CG1000 RTP Oxygen Analyzer This page intentionally left blank...
Page 96: ...B 4 Dycor CG1000 RTP Oxygen Analyzer This page intenionally left blank...