Installation
|
3-15
Figure 3
4.
Loosen one end of the 1/8” Swagelok tube fitting located at each end of
the stainless steel tubing (Figure 3).
5.
Feed the end of the capillary tube where the heater’s electrical connec-
tions are located into the valve end of the ProLine System (Figure 3).
Figure 4
6.
Tighten the 1/16” nut at the end of the heater assembly onto the 1/16”
threaded stub of the ProLine (Figure 4)
7.
Retighten the 1/8” Swagelok fitting located at the Proline side of the
heater assembly (Figure 4).
8.
Feed the remaining free end of the capillary heater assembly into the
customer process fitting (Figure 5).
Figure 5