3-14 | DYCOR LCD RESIDUAL GAS ANALYZER WITH SYSTEM 2000 SOFTWARE
Installation
Figure 1a
Figure 1b
Figure 1c
1.
Unwrap the Velcro straps on the ends of the insulated heater jacket
(Figures 1b and 1c) to expose the heater and inner tubing.
2.
Gently feed the fused silica capillary tube through the Swagelok fittings
and stainless steel tube until approximately 1 inch (2.54 cm) of capillary
tube is exposed at each end (Figures 2a and 2b).
Figure 2a Figure 2b
Do not force the capillary tube into the steel fittings. If the capillary tube gets
stuck, pull it back a few centimeters and then continue feeding it through.
3.
Install a graphite ferrule on each exposed end of the capillary tube with
the cone-shaped end of the ferrule facing away from the end of the
capillary tube.