1-2
SECTION 1 – INSTALLATION
The system power switch on the front panel also serves as a circuit breaker. If the breaker
trips, correct the electrical problem then reset the breaker by cycling the switch.
Connecting the Press to the Power Unit
There are three connections between the load frame and the control cabinet, 2 hydraulic lines
and a 25-pin cable connection.
1.
Connect the two hydraulic lines to the quick-connect fittings on the left side of the
control cabinet. Make certain that the hydraulic connections are fully coupled. The hose
from the bottom of the cylinder is connected to the bottom connection on the control
cabinet.
2.
Connect the cable between the two 25-pin connectors located on the load frame and the
control cabinet. The cable connections are labeled with a RED circle.
3.
Assemble the bottom platen and load cell in accordance with the illustration below:
Connecting to a Data Acquisition System
Serial Data Connection
The control cabinet includes a 25-pin connector on the left of the enclosure that is used for
communications with the optional Chandler Engineering Model 5270 Data Acquisition and
Control Software. The cable connections are labeled with a BLUE circle. A cable is
supplied with the unit.
Top Mandrel
Load Cell
Lower
Mandrel
Platen
Summary of Contents for Chandler Engineering 4207D
Page 8: ...P 4 PREFACE This page is intentionally left blank ...
Page 18: ...2 8 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank ...
Page 24: ...3 6 SECTION 3 MAINTENANCE This page is intentionally left blank ...
Page 28: ...5 2 SECTION 5 REPLACEMENT PARTS This page is intentionally left blank ...
Page 30: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS This page is intentionally left blank ...
Page 39: ...CHANDLER ENGINEERING ...
Page 40: ......