CONTROLLER CONFIGURATION 7
Display Configuration
The following table contains the default configuration for the load cell display.
FULL
MENUS
Comment
CONFIG
MENUS
Comment
HOME
INST
dSP.F
PV
Displays the present value
on the front display
unit None
No
Engineering
units
dSP.b
PV.Hi
Displays the peak value on
the back display
dEc.P nnnn.
5-digit
display
Cid
0.0
ID number
Ac.bu
Enab
Front panel Ack/Reset button
AL
IP
1___
0.0
Not used
inP.t
mV
Input type
2___
0.0
Not used
CJC
N/A
Not used
3___
0.0
Not used
imP
Auto
Input impedance
4___
0.0
Not used
tYPE
Ld.C
Load cell calibration
0.0
Not used
bAnd
0.01
Settling band
SP
inP.L
0.0
Low input value
SP L
0.0
Set Point Low Limit
inP.H
24.4
Varies with load cell calibration. Must be equal to
same value in controller
SP H
50000
Set Point High Limit
VAL.L
0.0
Low calibration value corresponding to low input
value
VAL.H
50000
High calibration value corresponding to low input
value
IP
FiL.t
STEP
Step filter type
AL
Int.t
N/A
Not used
AL 1
OFF
Not used
StP.b
1.0
Step
filter
band Ltch
OFS.1 Varies
value with no load
bLoc
OFS.2
N/A
Not used
AL 2
OFF
Not used
Lo.IP N/A
Not
used
Ltch
Hi.IP N/A
Not
used
bLoc
F.1
N/A
Not used
AL 3
OFF
Not used
F.2 N/A
Not
used
Ltch
PU.iP iP.1
Selects
input
1
bLoc
EmiS
N/A
Not used
AL 4
OFF
Not used
Emi.2 N/A
Not
used
Ltch
PU.SL
iP.1
Shows the selected input
bLoc
CAL 1
LA
tArE
OFF
Not used
id
LoG.I
Not used
CAL.P 3 Calibration
password
Func
None
cmS
LB
Addr
2
Modbus I/O Address
id
LoG.I
Not used
Func
None
INFO
LoG.L
Read Only Minimum process value
AA
LoG.H
Read Only Maximum process value
id
rEL.Y
Not used
LoG.A
Read Only Average process value
Func
None
LoG.t
Read Only Time process value above
threshold value
SEnS
LoG.u
0.0
Process value threshold
AL 1
rES.L
No
Changing to "Yes" resets
the peak value in Modbus
Register 133
AL 2
AL 3
Al 4
Sbr
SPAn
rmt.F
iP1.F
Summary of Contents for Chandler Engineering 4207D
Page 8: ...P 4 PREFACE This page is intentionally left blank ...
Page 18: ...2 8 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank ...
Page 24: ...3 6 SECTION 3 MAINTENANCE This page is intentionally left blank ...
Page 28: ...5 2 SECTION 5 REPLACEMENT PARTS This page is intentionally left blank ...
Page 30: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS This page is intentionally left blank ...
Page 39: ...CHANDLER ENGINEERING ...
Page 40: ......