Transportation/Setting-up
— 26
SPECTRO ARCOS FHX3X — 08.02.2022
5.2
Space requirement for machine operators and maintenance
personnel
For operation and maintenance purposes a clearance of at least 1 m is required at
the front and on both sides of the instrument. Install the instrument with these
requirements in mind.
5.3 Set-up
Caution! Measurement errors!
If the instrument is subject to vibrations and shocks, measurement errors
may occur during the measuring process.
The instrument must be installed at a vibration- and shock-free location.
Measurement errors result from temperature differences inside the
instrument.
The instrument must be installed at a location, where it cannot heat up
or cool down on one side only.
Observe the following information regarding the instrument's installation:
All connections are located on the right-hand side.
The instrument must be accessible from the front and from both sides for
maintenance purposes. Set up the instrument accordingly.
A table of corresponding dimensions and load-carrying capacity is required,
see page 23.
In addition to the space required by the SPECTRO ARCOS FHX3X, some
space is needed for the gas supply, unless fixed gas connections are
available.
The SPECTRO ARCOS FHX3X is operated exclusively from the front and
from the right-hand side of the housing. Sufficient space should be provided
for the computer workstation (keyboard, monitor, printer, and sample changer,
if necessary) and operating personnel.
5.4 Ambient
temperature
Air conditioning of the room is only required under extraordinary conditions. The
instrument was designed to accept small room temperature fluctuations of up to
3 °C/h (5.4 °F/h). However, one-sided heating or cooling must be avoided.
The specified values only apply to the recommended ambient temperature range.
Using the instrument beyond the recommended ambient conditions may lead to
poorer analytical results.
Summary of Contents for 76004567
Page 2: ......