6
HERCULES II HYBRID INSTALLATION GUIDE
(800) 580-0831
www.AmeriGlide.com
AmeriGlide
The
Hercules II Hybrid
Vertical Platform Lift has been designed to meet
CSA B613-00
& B355-15
standards. Code requirements and standards for vertical platform lifts vary
depending on location and region. It is the installer’s responsibility to contact their
local code enforcement office and determine all of the regulations they are subject to
before installing the
Hercules II Hybrid
Vertical Platform Lift.
The
Hercules II Hybrid
Vertical Platform Lift requires a 110VDC-15 AMP grounded
electrical circuit and a GFCI protected circuit. Depending on local codes and
regulations, this connection may need to be routed in electrical conduit and hard-
wired.
- Upon receipt of the
Hercules II Hybrid
Vertical Platform Lift, verify the lift for
shipping damage immediately. Report any discrepancies or damage claims to your
dealer.
- Carefully verify all the site specifics, technical drawings and all preparatory work
prior to installation.
The
Hercules II Hybrid
must be installed on a Supporting Wall and Floor that is
capable of supporting the minimum load and standards as laid out in the Technical
Drawings. Please read and verify with the Technical Drawings before beginning the
installation of the
Hercules II Hybrid
.
CODES AND STANDARDS
ELECTRICAL REQUIREMENTS
BEFORE YOU GET STARTED
SITE REQUIREMENTS
DO NOT OPERATE OR RIDE ON THE LIFT UNTIL IT HAS BEEN ANCHORED TO AN APPROVED PAD OR
FLOOR.
WARNING