30
2. Technical Gas Data
a. Gas Specifications
b. Gas Connections
Run a 1-1/2” pipe from the main gas header to the dryer. There are two (2) 1-1/4” gas pipe connections
at the top of the dryer. The dryer has two (2) gas burner boxes and each one (1) has its own 1-1/4” gas
connection.
Inlet connection ----------- two (2) 1-1/4” N.P.T.
Inlet Supply Size ----------- 1-1/2” N.P.T. (minimum)
BTU/hr input (per dryer) - 1,125,000 (283,500 kcal/hr)
1) Natural Gas
Pressure regulation is controlled by both gas valve’s internal regulators. Incoming supply pressure
must be
consistently between a minimum of 6.0 inches (14.92 mb) water column (W.C.) and a
maximum of 12.0 inches (29.9 mb) water column.
2) Liquid Propane (L.P.) Gas
Dryers made for use with L.P. gas have both of their gas valves internal pressure regulators blocked
open so that the gas pressure
must be
regulated upstream of the dryer. The pressure is measured
at each gas valve pressure tap
must be
a consistent 10.5 inches (26.1 mb) water column. There is
no regulator or regulation provided in an L.P. gas dryer. The water column
must be
regulated at the
source (L.P. tank) or external regulator/regulation
must be
added to each dryer.
TYPE OF GAS
NATURAL
LIQUID PROPANE
Manifold Pressure*
3.5 inches W.C.
8.7 mb
10.5 inches W.C.
26.1 mb
In-Line Pressure
6.0 - 12.0 inches W.C.
14.92 - 29.9 mb
10.5 inches W.C.
26.1 mb
Shaded areas are stated in metric equivalents
* Measured at outlet side of gas valve pressure tap when gas valve is on.
Summary of Contents for AD-310
Page 11: ...7 310 NON TILT GAS MODEL B DIMENSIONS AND COMPONENT LOCATION ...
Page 12: ...8 310 NON TILT STEAM MODEL ...
Page 14: ...10 1 Reassembly Instructions For Gas Dryer Shipped In Two 2 Pieces ...
Page 16: ...12 2 Reassembly Instructions For Steam Dryer Shipped In Two 2 Pieces ...
Page 22: ...18 ...
Page 23: ...19 ...
Page 24: ...20 ...
Page 64: ...60 B I O BOARD INPUT AND OUTPUT L E D INDICATORS ...
Page 80: ...76 ...