
11
a. Reassembly Instructions For Non-Tilt Gas Dryers:
Lift the basket (tumbler) section onto the base.
1) The dryer has four (4) support posts assemblies which are located in each corner of the base. On
top of each post assembly is a clevis block which
must be
bolted to the basket (tumbler) section.
Use the 4-1/2” diameter x 1-1/8” long bolts and lock washers to bolt each clevis block to the basket
(tumbler) section. (Refer to
View 1
on the previous page.)
2) Basket (tumbler) power cable reconnection:
a) A plug and cable is located in the right of the base. This
must be
lifted up and reconnected into
the mating socket located at the bottom of the right basket (tumbler) section.
b) Pull the basket (tumbler) section power cable up from the left side of the base through the hole
in the bottom of the basket (tumbler) section. Reconnect the wires of this cable into the 2-inch
x 4-inch (5.08 cm x 10.16 cm) basket (tumbler) junction box located at the bottom of the basket
(tumbler) section. (Refer to the
illustration
on the previous page.)
c) Drop the control cable connector from the rear right side of the basket (tumbler) section into the
base. Reconnect the industrial grade plug in to its mating socket.
3) Bolt the 24-inch (60.96 cm) diameter exhaust duct transition piece to the dryers rectangular exhaust
duct. The exhaust duct exits the dryer from the rear of the base. (Refer to the
illustration
on the
previous page.) Use the 1/4-20 self drilling screws supplied with the dryer.
Summary of Contents for AD-310
Page 11: ...7 310 NON TILT GAS MODEL B DIMENSIONS AND COMPONENT LOCATION ...
Page 12: ...8 310 NON TILT STEAM MODEL ...
Page 14: ...10 1 Reassembly Instructions For Gas Dryer Shipped In Two 2 Pieces ...
Page 16: ...12 2 Reassembly Instructions For Steam Dryer Shipped In Two 2 Pieces ...
Page 22: ...18 ...
Page 23: ...19 ...
Page 24: ...20 ...
Page 64: ...60 B I O BOARD INPUT AND OUTPUT L E D INDICATORS ...
Page 80: ...76 ...